0.2kw~90kw Helical Speed Reduction Gearbox with Output Solid Shaft

0.2kw~90kw Helical Speed Reduction CZPT with Output Solid Shaft

R series CZPTcal Geared Motor Characteristics

one. Functions:

one. High performance: 92%-97%

 

2. Compact composition: Tiny offset output, two stage and three stage are in the same box.

 

3. High precision: the gear is made of large-quality alloy steel forging, carbonitriding and hardening therapy, grinding process to make sure large precision and steady running.

4. High interchangeability: highly modular, serial style, robust versatility and interchangeability.

2. CZPT parameters

Ratio three.41-289.74
Input power .12-160KW
Output torque sixty one-23200N.m
Output pace five-415rpm
Mounting sort Foot mounted, flange mounted, foot and flange mounted, solitary-phase foot mounted, single stage flange mounted, Flange-mounted with prolonged bearing hub
Input Technique Flange input(AM), shaft input(Advertisement), inline AC motor enter, or AQA servo motor
Brake Launch HF-handbook release(lock in the brake release place), HR-manual release(autom-atic braking position)
Thermistor TF(Thermistor protection PTC thermisto)
TH(Thermistor protection Bimetal swotch)
Mounting Placement M1, M2, M3, M4, M5, M6
Kind R17-R167
Output shaft dis. 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm
Housing content HT200 substantial-power forged iron from R37,forty seven,57,67,seventy seven,87
Housing content HT250 Higher power cast iron from R97 107,137,147,157,167,187
Warmth treatment technology carbonitriding and hardening treatment method
Efficiency ninety two%-ninety seven%
Lubricant VG220
Defense Course IP55, F class

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned armed forces mould company, was set up in 1965. CZPTshine specializes in the full energy transmission answer for substantial-end equipment manufacturing industries primarily based on the intention of “Platform Solution, Software Design and Specialist Service”.
CZPTshine have a sturdy technological pressure with above 350 employees at current, including in excess of 30 engineering professionals, 30 top quality inspectors, masking an location of 80000 sq. meters and kinds of CZPTd processing equipment and testing equipments. We have a great foundation for the market application development and service of large-conclude velocity reducers & variators possessing to the provincial engineering technologies study centre,the lab of equipment pace reducers, and the foundation of modern day R&D.

Our Staff

Good quality Handle
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
merchandise is a product inspection to determine the qualified products.

7. Certification.

Packing

Delivery

0.2kw~90kw Helical Speed Reduction CZPT with Output Solid Shaft