90 Degree Worm Gearbox with Motor

90 Degree Worm CZPT with Motor

RV series Attributes

  • RV – Measurements:030-040-050-063-075-a hundred and five-one hundred ten-one hundred thirty-150
  • Input Alternatives: with enter shaft, With Square flange,With Enter Flange
  • Enter Electrical power .06 to 11 kW
  • RV-Dimensions from 030 to 105 in die-cast aluminium alloy budy and more than a hundred and ten in forged iron
  • Ratios amongst 5 and one hundred
  • Max torque 1550 N.m and admissible output radial masses max 8771 N
  • Aluminium models are supplied total with synthetic oil and let for universal mounting positions, with no want to modify lubricant amount
  • Worm wheel: Copper (KK Cu). 
  • Loading potential in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Measurement 030 and above are painted with RAL 5571 blue
  • Worm gear reducers are CZPT with diffferent combos: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Choices: torque arm, output flange, viton oil seals, lower/large temperature oil, filling/drain/breather/level plug,Little gap

Fundamental types can be used to a wide range of power reduction ratios from five to one thousand.
Guarantee: One year from date of shipping.

 

WORM GEARBOX          
SNW SERIES          Output Pace Assortment:
Sort Outdated Variety Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Relevant Motor Electricity:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Enter Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Input Options2:
SNW090  RV090  410N.m  φ35   With Square flange
SNW105  RV105  630N.m  φ42   Enter Options3:
SNW110  RV110  725N.m  φ42   With Input Shaft
SNW130  RV130  1050N.m  φ45   Enter Options4:
SNW150  RV150  1550N.m  φ50   With Enter Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned military mould organization, was recognized in 1965. CZPTshine specializes in the total energy transmission solution for high-conclude gear producing industries based mostly on the intention of “Platform Product, Software Style and Specialist Services”.
CZPTshine have a sturdy complex pressure with above 350 personnel at current, like over thirty engineering technicians, 30 top quality inspectors, masking an region of 80000 sq. meters and varieties of CZPTd processing machines and screening equipments. We have a great foundation for the business application improvement and services of substantial-finish velocity reducers & variators possessing to the provincial engineering engineering analysis middle,the lab of equipment velocity reducers, and the base of modern R&D.

Our Staff

Good quality Handle
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Supply

90 Degree Worm CZPT with Motor