90% High Efficiency Helical Worm Gearbox

90% High Efficiency Helical Worm CZPT

S sequence CZPTcal Geared Motor Characteristics

1. Characteristics:

  1. Substantial effectiveness: seventy five%-80%
  2. Substantial technology: the helical equipment and a worm equipment combined with an integrated transmission to boost the torque and effectiveness.
  3. High precision: the equipment is manufactured of high-quality alloy steel forging, carbonitriding and hardening treatment, grinding process to ensure substantial precision and secure managing.
  4. Substantial interchangeability: very modular, serial layout, sturdy versatility and interchangeability.

2. CZPT parameters
 

Ratio 6.eight-288
Input energy .twelve-22KW
Output torque eleven-4530N.m
Output pace 5-206rpm
Mounting variety Foot mounted, foot mounted with solid shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. 
Input Approach Flange enter(AM), shaft input(Advert), inline AC motor input, or AQA servo motor
Brake Release HF-handbook release(lock in the brake release placement), HR-manual release(autom-atic braking placement)
Thermistor TF(Thermistor defense PTC thermisto)
TH(Thermistor protection Bimetal swotch)
Mounting Position M1, M2, M3, M4, M5, M6
Variety S37-S97
Output shaft dis. 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm,
Housing substance HT200 substantial-energy solid iron from R37,forty seven,57,67,seventy seven,87
Housing substance HT250 Higher energy cast iron from R97 107,137,147,
157,167,187
Heat treatment technology carbonitriding and hardening treatment method
One Stage Performance 75%-eighty%
Lubricant VG220
Safety Course IP55, F class

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned military mould organization, was recognized in 1965. CZPTshine specializes in the full electrical power transmission solution for higher-end products production industries based on the aim of “Platform Solution, Software Design and style and Skilled Support”.
CZPTshine have a powerful technological pressure with over 350 workers at present, such as in excess of 30 engineering experts, thirty quality inspectors, covering an spot of 80000 sq. meters and sorts of CZPTd processing equipment and testing equipments. We have a excellent basis for the sector application advancement and service of high-end speed reducers & variators possessing to the provincial engineering technologies analysis middle,the lab of equipment pace reducers, and the base of modern day R&D.

Our Crew

High quality Manage
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
product is a product inspection to determine the qualified products.

seven. Certification.

Packing

Shipping

 

90% High Efficiency Helical Worm CZPT