Aluminum Housing Worm Gearbox Speed Reducer

Aluminum Housing Worm CZPT Speed Reducer

RV collection Attributes

  • RV – Measurements:030-040-050-063-075-one zero five-one hundred ten-130-150
  • Input Alternatives: with input shaft, With Square flange,With Enter Flange
  • Input Electrical power .06 to 11 kW
  • RV-Measurement from 030 to 105 in die-cast aluminium alloy budy and more than one hundred ten in solid iron
  • Ratios in between five and a hundred
  • Max torque 1550 N.m and admissible output radial loads max 8771 N
  • Aluminium models are equipped comprehensive with synthetic oil and allow for universal mounting positions, with no require to modify lubricant quantity
  • Worm wheel: Copper (KK Cu). 
  • Loading potential in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Measurement 030 and more than are painted with RAL 5571 blue
  • Worm gear reducers are CZPT with diffferent combinations: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Choices: torque arm, output flange, viton oil seals, lower/large temperature oil, filling/drain/breather/level plug,Little hole

Standard types can be used to a vast assortment of energy reduction ratios from 5 to 1000.
Guarantee: One year from date of shipping and delivery.

 

WORM GEARBOX          
SNW SERIES          Output Pace Range:
Sort Old Type Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Relevant Motor Electricity:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Enter Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Input Options2:
SNW090  RV090  410N.m  φ35   With Square flange
SNW105  RV105  630N.m  φ42   Input Options3:
SNW110  RV110  725N.m  φ42   With Input Shaft
SNW130  RV130  1050N.m  φ45   Enter Options4:
SNW150  RV150  1550N.m  φ50   With Enter Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned army mould business, was proven in 1965. CZPTshine specializes in the total electricity transmission resolution for large-stop gear production industries primarily based on the goal of “System Solution, Software Design and Expert Service”.
CZPTshine have a sturdy specialized drive with over 350 workers at existing, like over 30 engineering professionals, 30 high quality inspectors, masking an location of 80000 sq. meters and varieties of CZPTd processing machines and tests equipments. We have a great foundation for the market application growth and service of large-end velocity reducers & variators possessing to the provincial engineering technology study middle,the lab of gear pace reducers, and the foundation of contemporary R&D.

Our Team

Quality Manage
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Shipping

Aluminum Housing Worm CZPT Speed Reducer