RV collection Qualities
- RV – Measurements:030-040-050-063-075-one zero five-one hundred ten-a hundred thirty-150
- Enter Options: with input shaft, With Sq. flange,With Enter Flange
- Input Energy .06 to 11 kW
- RV-Size from 030 to 105 in die-solid aluminium alloy budy and more than a hundred and ten in cast iron
- Ratios between five and a hundred
- Max torque 1550 N.m and admissible output radial hundreds max 8771 N
- Aluminium units are equipped full with synthetic oil and enable for common mounting positions, with no need to have to modify lubricant quantity
- Worm wheel: Copper (KK Cu).
- Loading capacity in accordance with: ISO 9001:2015/GB/T 19001-2016
- Dimensions 030 and more than are painted with RAL 5571 blue
- Worm gear reducers are CZPT with diffferent combos: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
- NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
- Choices: torque arm, output flange, viton oil seals, reduced/high temperature oil, filling/drain/breather/amount plug,Tiny hole
Standard designs can be applied to a vast assortment of electrical power reduction ratios from five to one thousand.
Warranty: One year from date of shipping and delivery.
WORM GEARBOX | |||||
SNW SERIES | Output Pace Selection: | ||||
Kind | Previous Kind | Output Torque | Output Shaft Dia. | 14rpm-280rpm | |
SNW030 | RV030 | 21N.m | φ14 | Applicable Motor Power: | |
SNW040 | RV040 | 45N.m | φ19 | .06kW-11kW | |
SNW050 | RV050 | 84N.m | φ25 | Input Options1: | |
SNW063 | RV063 | 160N.m | φ25 | With Inline AC Motor | |
SNW075 | RV075 | 230N.m | φ28 | Enter Options2: | |
SNW090 | RV090 | 410N.m | φ35 | With Sq. flange | |
SNW105 | RV105 | 630N.m | φ42 | Input Options3: | |
SNW110 | RV110 | 725N.m | φ42 | With Input Shaft | |
SNW130 | RV130 | 1050N.m | φ45 | Input Options4: | |
SNW150 | RV150 | 1550N.m | φ50 | With Enter Flange |
CZPTshine CZPT
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned military mould organization, was set up in 1965. CZPTshine specializes in the comprehensive power transmission answer for substantial-end equipment production industries primarily based on the aim of “Platform Merchandise, Software Layout and Specialist Services”.
CZPTshine have a robust technological power with over 350 workers at present, which includes over 30 engineering experts, thirty high quality inspectors, covering an location of 80000 sq. meters and varieties of CZPTd processing devices and testing equipments. We have a good foundation for the sector application improvement and service of higher-stop velocity reducers & variators proudly owning to the provincial engineering technologies study middle,the lab of gear pace reducers, and the foundation of modern R&D.
Our Staff
Top quality Management
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
is a product inspection to determine the qualified products.
Packing
Shipping