B Jxj Series Cycloidal Speed Gearbox Without Motor

B Jxj Series Cycloidal Speed CZPT Without Motor

CZPTshine CZPT Cycloid Geared Motor Traits

one. Characteristics:
one. Smooth running,reduced sound gear tooth needle much more engagement.
two. Cycloidal tooth profile offers a higher contact ratio to withstand overload shocks
3. Compact dimension: one ratio CZPT from 1/9 to 1/87, double stage up from 1/99 to one/7569 
4. Excellent for dynamic purposes: regular begin-quit-reversing duties suits for cyclo pace reducer considering that inertia is low
5. Reduce maintenance charges: high reliability, prolonged daily life, minimal servicing compared to traditional gearboxes
6. Internal components replaceable with other makes to make sure working.

seven. Grease Lubricated & Oil Lubricated Designs Obtainable
eight. Output Shaft Rotation Route: Solitary Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
nine. Ambient Problems: Indoor Set up:10-forty Celsius, Max eighty five% Humidity, Under 1000m Altitude, Effectively Ventilated Setting, Totally free of corrosive,        explosive gases, vapors and dust
10.Sluggish Velocity Shaft Direction: Horizontal, Vertical Up & Down, CZPT Route
eleven.Mounting Design: Foot Mount, Flange Mount & Vertical F-flange Mount,
twelve. Enter Link: Cyclo Integral Motor, Hollow Enter Shaft Adapter
thirteen. Coupling Approach With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
14. Cycloid reducer Potential Variety: .37kW ~ 11kW

two. CZPT parameters

Type Previous Variety Output Torque Output Shaft Dia.
SXJ00 JXJ00 98N.m φ30
SXJ01 JXJ01 221N.m φ35
SXJ02 JXJ02 448N.m φ45
SXJ03 JXJ03 986N.m φ55
SXJ04 JXJ04 1504N.m φ70
SXJ05 JXJ05 3051N.m φ90
SXJ06 JXJ06 5608N.m φ100

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned armed forces mould organization, was recognized in 1965. CZPTshine specializes in the total electricity transmission resolution for high-finish gear manufacturing industries based mostly on the goal of “Platform Solution, Software Design and Expert Services”.
CZPTshine have a robust specialized force with above 350 personnel at current, which includes in excess of thirty engineering technicians, thirty high quality inspectors, covering an spot of 80000 sq. meters and kinds of CZPTd processing devices and testing equipments. We have a very good basis for the industry software improvement and services of substantial-end pace reducers & variators owning to the provincial engineering engineering analysis center,the lab of equipment pace reducers, and the base of present day R&D.

Our Crew

Top quality Control
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
solution is a product inspection to determine the qualified products.

seven. Certification.

Packing

Shipping and delivery

B Jxj Series Cycloidal Speed CZPT Without Motor