Big Torque Cycloidal Gearbox with Foot Mounting for Impact and Loading Situations

Big Torque Cycloidal CZPT with Foot Mounting for Impact and Loading Situations

CZPTshine CZPT Cycloid Geared Motor Traits

one. Attributes:
1. Smooth working,lower sound gear tooth needle more engagement.
two. Cycloidal tooth profile provides a higher contact ratio to face up to overload shocks
3. Compact dimensions: single ratio CZPT from 1/9 to one/87, double phase up from 1/99 to one/7569 
four. Ideal for dynamic programs: repeated commence-cease-reversing responsibilities fits for cyclo speed reducer because inertia is lower
five. Decrease upkeep expenses: higher trustworthiness, long lifestyle, minimum upkeep compared to standard gearboxes
6. Interior elements replaceable with other brands to ensure running.

7. Grease Lubricated & Oil Lubricated Designs Available
8. Output Shaft Rotation Direction: Solitary Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
nine. Ambient Situations: Indoor Installation:ten-forty Celsius, Max 85% Humidity, Beneath 1000m Altitude, Well Ventilated Setting, Cost-free of corrosive,        explosive gases, vapors and dust
ten.Gradual Pace Shaft Course: Horizontal, Vertical Up & Down, CZPT Route
eleven.Mounting Design: Foot Mount, Flange Mount & Vertical F-flange Mount,
twelve. Input Connection: Cyclo Integral Motor, Hollow Input Shaft Adapter
13. Coupling Approach With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
fourteen. Cycloid reducer Capability Variety: .37kW ~ 11kW

2. CZPT parameters

Sort Old Sort Output Torque Output Shaft Dia.
SXJ00 JXJ00 98N.m φ30
SXJ01 JXJ01 221N.m φ35
SXJ02 JXJ02 448N.m φ45
SXJ03 JXJ03 986N.m φ55
SXJ04 JXJ04 1504N.m φ70
SXJ05 JXJ05 3051N.m φ90
SXJ06 JXJ06 5608N.m φ100

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned army mould business, was set up in 1965. CZPTshine specializes in the full electrical power transmission solution for high-finish equipment producing industries primarily based on the aim of “Platform Merchandise, Software Design and style and Skilled Services”.
CZPTshine have a powerful technological power with over 350 employees at current, like over 30 engineering technicians, thirty top quality inspectors, masking an spot of 80000 sq. meters and kinds of CZPTd processing devices and tests equipments. We have a very good foundation for the sector software improvement and provider of substantial-conclude velocity reducers & variators possessing to the provincial engineering technology research center,the lab of gear velocity reducers, and the base of modern R&D.

Our Group

Quality Manage
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
solution is a product inspection to determine the qualified products.

7. Certification.

Packing

Delivery

 

Big Torque Cycloidal CZPT with Foot Mounting for Impact and Loading Situations