China Small Nmrv 050 Worm Gearbox

China Small Nmrv 050 Worm CZPT

RV series Traits

  • RV – Dimensions:030-040-050-063-075-a hundred and five-a hundred and ten-one hundred thirty-a hundred and fifty
  • Enter Options: with enter shaft, With Sq. flange,With Input Flange
  • Enter Electricity .06 to 11 kW
  • RV-Measurement from 030 to 105 in die-cast aluminium alloy budy and above 110 in solid iron
  • Ratios between five and a hundred
  • Max torque 1550 N.m and admissible output radial masses max 8771 N
  • Aluminium models are provided complete with synthetic oil and let for universal mounting positions, with no need to have to modify lubricant amount
  • Worm wheel: Copper (KK Cu). 
  • Loading potential in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Measurement 030 and in excess of are painted with RAL 5571 blue
  • Worm equipment reducers are CZPT with diffferent mixtures: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Possibilities: torque arm, output flange, viton oil seals, low/large temperature oil, filling/drain/breather/degree plug,Tiny hole

Standard types can be used to a extensive range of electrical power reduction ratios from five to 1000.
Warranty: One year from day of supply.

 

WORM GEARBOX          
SNW SERIES          Output Velocity Selection:
Sort Outdated Kind Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Relevant Motor Power:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Enter Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Enter Options2:
SNW090  RV090  410N.m  φ35   With Sq. flange
SNW105  RV105  630N.m  φ42   Input Options3:
SNW110  RV110  725N.m  φ42   With Input Shaft
SNW130  RV130  1050N.m  φ45   Enter Options4:
SNW150  RV150  1550N.m  φ50   With Enter Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned military mould business, was recognized in 1965. CZPTshine specializes in the full electricity transmission remedy for high-conclude equipment production industries based on the goal of “System Solution, Software Design and style and Expert Service”.
CZPTshine have a robust technical drive with more than 350 personnel at present, such as above 30 engineering professionals, 30 good quality inspectors, masking an region of 80000 sq. meters and varieties of CZPTd processing equipment and testing equipments. We have a great foundation for the sector software improvement and services of large-finish speed reducers & variators proudly owning to the provincial engineering technological innovation analysis center,the lab of gear velocity reducers, and the base of modern R&D.

Our Staff

Top quality Control
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Delivery

China Small Nmrv 050 Worm CZPT