Cycloidal Gearbox for Impact and Loading Situations

Cycloidal CZPT for Impact and Loading Situations

CZPTshine CZPT Cycloid Geared Motor Traits

1. Functions:
one. Smooth operating,reduced noise gear tooth needle more engagement.
two. Cycloidal tooth profile provides a high make contact with ratio to stand up to overload shocks
three. Compact size: single ratio CZPT from 1/9 to 1/87, double stage up from 1/ninety nine to 1/7569 
4. Best for dynamic purposes: frequent start-quit-reversing responsibilities satisfies for cyclo pace reducer since inertia is reduced
five. Reduce maintenance charges: substantial reliability, long lifestyle, nominal upkeep in comparison to typical gearboxes
6. Internal areas replaceable with other manufacturers to make sure running.

7. Grease Lubricated & Oil Lubricated Versions Offered
eight. Output Shaft Rotation Route: One Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
9. Ambient Conditions: Indoor Set up:10-40 Celsius, Max 85% Humidity, Underneath 1000m Altitude, Nicely Ventilated Atmosphere, Free of corrosive,        explosive gases, vapors and dust
ten.Gradual Pace Shaft Course: Horizontal, Vertical Up & Down, CZPT Path
eleven.Mounting Fashion: Foot Mount, Flange Mount & Vertical F-flange Mount,
twelve. Input Connection: Cyclo Integral Motor, Hollow Input Shaft Adapter
thirteen. Coupling Technique With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
fourteen. Cycloid reducer Capability Selection: .37kW ~ 11kW

two. CZPT parameters

Kind Outdated Type Output Torque Output Shaft Dia.
SXJ00 JXJ00 98N.m φ30
SXJ01 JXJ01 221N.m φ35
SXJ02 JXJ02 448N.m φ45
SXJ03 JXJ03 986N.m φ55
SXJ04 JXJ04 1504N.m φ70
SXJ05 JXJ05 3051N.m φ90
SXJ06 JXJ06 5608N.m φ100

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned armed forces mould business, was proven in 1965. CZPTshine specializes in the complete electricity transmission resolution for higher-conclude gear manufacturing industries dependent on the purpose of “Platform Merchandise, Application Design and style and Expert Support”.
CZPTshine have a powerful complex power with in excess of 350 workers at existing, such as in excess of thirty engineering specialists, 30 quality inspectors, masking an location of 80000 sq. meters and types of CZPTd processing devices and tests equipments. We have a excellent basis for the sector software improvement and support of substantial-end velocity reducers & variators proudly owning to the provincial engineering engineering analysis centre,the lab of gear velocity reducers, and the base of modern R&D.

Our Staff

High quality Handle
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
solution is a product inspection to determine the qualified products.

seven. Certification.

Packing

Supply

 

Cycloidal CZPT for Impact and Loading Situations