Cycloidal Gearbox with Double Reduction

Cycloidal CZPT with Double Reduction

CZPTshine CZPT Cycloid Geared Motor Characteristics

1. Features:
1. Smooth managing,low sounds gear tooth needle more engagement.
2. Cycloidal tooth profile gives a higher make contact with ratio to endure overload shocks
three. Compact measurement: single ratio CZPT from one/9 to one/87, double phase up from 1/99 to 1/7569 
4. Perfect for dynamic applications: regular commence-end-reversing responsibilities fits for cyclo pace reducer since inertia is minimal
5. Minimize maintenance charges: high reliability, prolonged lifestyle, minimal servicing compared to standard gearboxes
6. Inner areas replaceable with other manufacturers to make sure running.

seven. Grease Lubricated & Oil Lubricated Models Obtainable
eight. Output Shaft Rotation Route: One Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
9. Ambient Situations: Indoor Set up:10-forty Celsius, Max eighty five% Humidity, Under 1000m Altitude, Properly Ventilated Surroundings, Free of charge of corrosive,        explosive gases, vapors and dust
ten.Gradual Speed Shaft Course: Horizontal, Vertical Up & Down, CZPT Route
11.Mounting Design: Foot Mount, Flange Mount & Vertical F-flange Mount,
12. Enter Relationship: Cyclo Integral Motor, Hollow Input Shaft Adapter
13. Coupling Strategy With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
fourteen. Cycloid reducer Ability Variety: .37kW ~ 11kW

2. CZPT parameters

Variety Previous Kind Output Torque Output Shaft Dia.
SXJ00 JXJ00 98N.m φ30
SXJ01 JXJ01 221N.m φ35
SXJ02 JXJ02 448N.m φ45
SXJ03 JXJ03 986N.m φ55
SXJ04 JXJ04 1504N.m φ70
SXJ05 JXJ05 3051N.m φ90
SXJ06 JXJ06 5608N.m φ100

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned army mould organization, was set up in 1965. CZPTshine specializes in the comprehensive power transmission resolution for higher-end products production industries based on the goal of “Platform Merchandise, Software Layout and Specialist Services”.
CZPTshine have a strong technical force with in excess of 350 staff at current, such as over thirty engineering specialists, 30 high quality inspectors, masking an region of 80000 sq. meters and kinds of CZPTd processing machines and screening equipments. We have a good foundation for the business software growth and provider of higher-finish pace reducers & variators proudly owning to the provincial engineering technology analysis heart,the lab of gear speed reducers, and the foundation of modern R&D.

Our Staff

Top quality Control
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
merchandise is a product inspection to determine the qualified products.

7. Certification.

Packing

Supply

 

Cycloidal CZPT with Double Reduction