Cycloidal Gearbox with Horizontal Foot Mounted

Cycloidal CZPT with Horizontal Foot Mounted

CZPTshine CZPT Cycloid Geared Motor Attributes

one. Functions:
1. Smooth managing,reduced sound gear tooth needle a lot more engagement.
two. Cycloidal tooth profile supplies a high make contact with ratio to face up to overload shocks
3. Compact size: solitary ratio CZPT from one/9 to 1/87, double phase up from 1/99 to 1/7569 
four. Perfect for dynamic applications: regular start off-cease-reversing duties suits for cyclo pace reducer since inertia is low
five. Minimize routine maintenance fees: higher dependability, long daily life, small routine maintenance when compared to standard gearboxes
six. Internal parts replaceable with other brand names to make certain operating.

7. Grease Lubricated & Oil Lubricated Designs Available
8. Output Shaft Rotation Path: Single Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
nine. Ambient Circumstances: Indoor Set up:ten-forty Celsius, Max 85% Humidity, Below 1000m Altitude, Nicely Ventilated Atmosphere, Cost-free of corrosive,        explosive gases, vapors and dust
ten.Gradual Velocity Shaft Course: Horizontal, Vertical Up & Down, CZPT Route
11.Mounting Design: Foot Mount, Flange Mount & Vertical F-flange Mount,
twelve. Input Relationship: Cyclo Integral Motor, Hollow Input Shaft Adapter
13. Coupling Strategy With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
14. Cycloid reducer Capability Range: .37kW ~ 11kW

2. CZPT parameters

Type Outdated Variety Output Torque Output Shaft Dia.
SXJ00 JXJ00 98N.m φ30
SXJ01 JXJ01 221N.m φ35
SXJ02 JXJ02 448N.m φ45
SXJ03 JXJ03 986N.m φ55
SXJ04 JXJ04 1504N.m φ70
SXJ05 JXJ05 3051N.m φ90
SXJ06 JXJ06 5608N.m φ100

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned army mould enterprise, was recognized in 1965. CZPTshine specializes in the total electrical power transmission resolution for higher-finish products producing industries based mostly on the intention of “System Merchandise, Application Style and Skilled Provider”.
CZPTshine have a powerful specialized pressure with in excess of 350 workers at existing, such as in excess of 30 engineering specialists, 30 good quality inspectors, covering an location of 80000 square meters and varieties of CZPTd processing machines and tests equipments. We have a very good foundation for the market application advancement and support of higher-conclude pace reducers & variators owning to the provincial engineering technology research middle,the lab of equipment speed reducers, and the foundation of contemporary R&D.

Our Staff

Top quality Manage
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
product is a product inspection to determine the qualified products.

seven. Certification.

Packing

Shipping and delivery

 

Cycloidal CZPT with Horizontal Foot Mounted