Cycloidal Gearbox Without Motor

Cycloidal CZPT Without Motor

CZPTshine CZPT Cycloid Geared Motor Characteristics

1. Functions:
1. Smooth managing,minimal sounds gear tooth needle a lot more engagement.
2. Cycloidal tooth profile gives a substantial make contact with ratio to endure overload shocks
3. Compact measurement: single ratio CZPT from one/9 to 1/87, double phase up from 1/99 to 1/7569 
4. Excellent for dynamic purposes: frequent start off-end-reversing responsibilities fits for cyclo speed reducer since inertia is minimal
five. Decrease routine maintenance charges: higher reliability, lengthy daily life, minimal maintenance in contrast to standard gearboxes
6. Interior areas replaceable with other makes to ensure running.

7. Grease Lubricated & Oil Lubricated Versions Accessible
8. Output Shaft Rotation Path: Solitary Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
nine. Ambient Situations: Indoor Installation:10-40 Celsius, Max 85% Humidity, Below 1000m Altitude, Properly Ventilated Setting, Totally free of corrosive,        explosive gases, vapors and dust
10.Sluggish Velocity Shaft Path: Horizontal, Vertical Up & Down, CZPT Path
11.Mounting Fashion: Foot Mount, Flange Mount & Vertical F-flange Mount,
12. Enter Connection: Cyclo Integral Motor, Hollow Enter Shaft Adapter
thirteen. Coupling Technique With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
fourteen. Cycloid reducer Ability Variety: .37kW ~ 11kW

two. CZPT parameters

Kind Outdated Kind Output Torque Output Shaft Dia.
SXJ00 JXJ00 98N.m φ30
SXJ01 JXJ01 221N.m φ35
SXJ02 JXJ02 448N.m φ45
SXJ03 JXJ03 986N.m φ55
SXJ04 JXJ04 1504N.m φ70
SXJ05 JXJ05 3051N.m φ90
SXJ06 JXJ06 5608N.m φ100

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned armed forces mould organization, was set up in 1965. CZPTshine specializes in the comprehensive electrical power transmission resolution for substantial-conclude gear producing industries primarily based on the purpose of “Platform Item, Application Design and style and Professional Services”.
CZPTshine have a powerful specialized pressure with over 350 staff at present, which includes in excess of thirty engineering specialists, thirty quality inspectors, covering an location of 80000 square meters and sorts of CZPTd processing equipment and tests equipments. We have a excellent basis for the industry application growth and service of large-end velocity reducers & variators owning to the provincial engineering technologies research middle,the lab of gear speed reducers, and the foundation of modern day R&D.

Our Staff

Top quality Management
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
solution is a product inspection to determine the qualified products.

seven. Certification.

Packing

Supply

 

Cycloidal CZPT Without Motor