CZPTshine CZPT Cycloid Geared Motor Qualities
one. Attributes:
one. Smooth working,low sounds equipment tooth needle much more engagement.
two. Cycloidal tooth profile gives a higher make contact with ratio to face up to overload shocks
3. Compact measurement: one ratio CZPT from one/9 to 1/87, double stage up from 1/ninety nine to 1/7569
4. Best for dynamic apps: recurrent start-quit-reversing responsibilities suits for cyclo velocity reducer considering that inertia is lower
5. Lessen servicing costs: higher dependability, lengthy life, minimum upkeep when compared to typical gearboxes
6. Internal areas replaceable with other brands to make certain managing.
seven. Grease Lubricated & Oil Lubricated Types Obtainable
eight. Output Shaft Rotation Course: Single Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
9. Ambient Circumstances: Indoor Set up:10-40 Celsius, Max 85% Humidity, Under 1000m Altitude, Properly Ventilated Atmosphere, Totally free of corrosive, explosive gases, vapors and dust
10.Slow Speed Shaft Path: Horizontal, Vertical Up & Down, CZPT Direction
eleven.Mounting Type: Foot Mount, Flange Mount & Vertical F-flange Mount,
twelve. Input Connection: Cyclo Integral Motor, Hollow Enter Shaft Adapter
thirteen. Coupling Strategy With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
fourteen. Cycloid reducer Capacity Range: .37kW ~ 11kW
two. CZPT parameters
Variety | Old Variety | Output Torque | Output Shaft Dia. |
SXJ00 | JXJ00 | 98N.m | φ30 |
SXJ01 | JXJ01 | 221N.m | φ35 |
SXJ02 | JXJ02 | 448N.m | φ45 |
SXJ03 | JXJ03 | 986N.m | φ55 |
SXJ04 | JXJ04 | 1504N.m | φ70 |
SXJ05 | JXJ05 | 3051N.m | φ90 |
SXJ06 | JXJ06 | 5608N.m | φ100 |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned military mould business, was established in 1965. CZPTshine specializes in the total power transmission remedy for substantial-end tools production industries primarily based on the purpose of “System Merchandise, Software Design and style and Skilled Services”.
CZPTshine have a sturdy technical power with above 350 workers at existing, like over 30 engineering specialists, thirty top quality inspectors, covering an spot of 80000 square meters and sorts of CZPTd processing devices and tests equipments. We have a good foundation for the market application advancement and support of large-conclude velocity reducers & variators possessing to the provincial engineering technologies analysis centre,the lab of gear pace reducers, and the foundation of modern R&D.
Our Group
Top quality Manage
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
product is a product inspection to determine the qualified products.
seven. Certification.
Packing
Delivery