Double Input Shaft Worm Gearbox Good Quality and Long Lifespan

Double Input Shaft Worm CZPT Good Quality and Long Lifespan

 

Item Description

Principal Functions:
one) Produced of substantial good quality aluminum alloy, gentle bodyweight and non-rusting
2) Massive output torque and higher radiating efficiency
3) Clean working and lower sounds, can work long time in dreadful situation
four) Great-seeking visual appeal, sturdy support lifestyle and little quantity
five) Ideal for omnibearing installation
Main Materials:
1)housing:aluminium alloy ADC12(measurement 571-090) die cast iron HT200(dimensions a hundred and ten-150)
2)Worm:20Cr, ZI Involute profile carbonize&quencher warmth treatment method make equipment floor hardness up to 56-62 HRC Right after precision grinding, carburization layer’s thickness among .three-.5mm.
3)Worm Wheel:wearable stannum alloy CuSn10-1
Mixture Alternatives:
Enter:with enter shaft, With sq. flange,With IEC common input flange
Output:with torque arm, output flange, single output shaft, double output shaft, plastic protect
Worm reducers are CZPT with diffferent combinations: NMRV+NMRV, NMRV+NRV, NMRV+Pc, NMRV+UDL, NMRV+MOTORS

In depth Pictures

Item Parameters

 Old Model        New Model     Ratio     Center Distance  Power Input Dia.  Output Dia.    Output Torque Bodyweight
RV571     7.five~100   25mm   .06KW~.12KW  Φ9 Φ11 21N.m  .7kgs
RV030 RW030 7.five~100 30mm   .06KW~.25KW Φ9(Φ11) Φ14 45N.m  one.2kgs
RV040 RW040 7.five~one hundred 40mm   .09KW~.55KW Φ9(Φ11,Φ14) Φ18(Φ19) 84N.m  two.3kgs
RV050 RW050 7.5~a hundred 50mm   .12KW~one.5KW Φ11(Φ14,Φ19) Φ25(Φ24) 160N.m  3.5kgs
RV063 RW063 7.five~one hundred 63mm   .18KW~2.2KW Φ14(Φ19,Φ24) Φ25(Φ28) 230N.m  6.2kgs
RV075 RW075 7.5~one hundred 75mm   .25KW~four.0KW Φ14(Φ19,Φ24,Φ28)  Φ28(Φ35) 410N.m  nine.0kgs
RV090 RW090 seven.5~100 90mm   .37KW~four.0KW Φ19(Φ24,Φ28) Φ35(Φ38) 725N.m  thirteen.0kgs
RV110 RW110 7.5~a hundred 110mm   .55KW~7.5KW Φ19(Φ24,Φ28,Φ38)   Φ42 1050N.m  35.0kgs
RV130 RW130 7.5~one hundred 130mm   .75KW~7.5KW Φ24(Φ28,Φ38) Φ45 1550N.m  forty eight.0kgs
RV150 RW150 seven.five~one hundred 150mm     two.2KW~15KW Φ28(Φ38,Φ42) Φ50   84.0kgs

Exploded Look at:

GMRV Define Dimension:

GMRV A B C C1 D(H8) E(h8) F G G1 H H1 I M N O P Q R S T BL β b t V  
030 eighty 97 54 forty four 14 fifty five 32 fifty six sixty three 65 29 55 40 57 thirty 75 forty four six.five 21 5.five M6*ten(n=four) five sixteen.3 27
040 a hundred 121.five 70 sixty 18(19) sixty forty three seventy one 78 seventy five 36.five 70 fifty seventy one.5 40 87 fifty five six.5 26 6.five M6*10(n=4) 45° six 20.8(21.eight) 35
050 120 one hundred forty four eighty 70 twenty five(24) 70 forty nine eighty five 92 eighty five forty three.5 eighty 60 84 fifty one hundred 64 8.five thirty seven M8*twelve(n=4) 45° 8 28.3(27.3) forty
063 144 174 a hundred 85 25(28) eighty sixty seven 103 112 ninety five 53 95 72 102 63 a hundred and ten 80 8.5 36 eight M8*12(n=eight) 45° 8 28.three(31.3) fifty
075 172 205 one hundred twenty 90 28(35) ninety five 72 112 one hundred twenty a hundred and fifteen fifty seven 112.five 86 119 75 one hundred forty 93 11 forty 10 M8*14(n=eight) 45° 8(ten) 31.three(38.3) 60
090 206 238 one hundred forty 100 35(38) 110 74 130 one hundred forty 130 67 129.five 103 135 ninety 160 102 thirteen forty five 11 M10*16(n=eight) 45° 10 38.3(forty one.three) 70
one hundred ten 255 295 a hundred and seventy 115 forty two one hundred thirty a hundred and forty four one hundred fifty five one hundred sixty five seventy four 160 127.five 167.5 one hundred ten 200 125 fourteen 50 14 M10*eighteen(n=8) 45° twelve 45.three 85
a hundred thirty 293 335 two hundred 120 forty five 180 155 170 215 81 179 146.five 187.5 130 250 a hundred and forty 16 60 fifteen M12*twenty(n=eight) 45° fourteen forty eight.eight a hundred
150 340 400 240 one hundred forty five fifty a hundred and eighty 185 two hundred 215 ninety six 210 170 230 a hundred and fifty 250 180 18 seventy two.five eighteen M12*22(n=eight) 45° 14 53.eight  120  

Organization Profile

About CZPT Transmission:
We are a professional reducer manufacturer found in HangCZPT, ZHangCZPTg province.
Our top products is  full selection of RV571-one hundred fifty worm reducers , also provided GKM hypoid helical gearbox, GRC inline helical gearbox, Computer models, UDL Variators and AC Motors, G3 helical gear motor.
Goods are widely employed for purposes these kinds of as: foodstuffs, ceramics, packing, chemical compounds, pharmacy, plastics, paper-producing, construction equipment, metallurgic mine, environmental security engineering, and all varieties of automatic strains, and assembly strains.
With fast delivery, exceptional after-revenue services, CZPTd producing facility, our goods sell well  both at residence and abroad. We have exported our reducers to Southeast Asia, CZPT CZPTpe and the Center CZPT and so on.Our goal is to develop and innovate on the basis of high quality, and generate a good status for reducers.
Workshop:

Exhibitions:
We take part Germany Hannver Exhibition-ZheCZPT PTC Honest-Turkey Acquire Eurasia

Packaging & Transport

  Packing info:CZPT Baggage+Cartons+Wood Cases , or on request

Installation Directions

To put in the reducer, it is necessary to notice the subsequent concerns:
one)Check out the proper rotation route of output shaft just before fitting reducer to machines.
2)Prior to mounting, pls check out shaft diameter, bore diameter, key and keyway, to be certain their dimension are not deviation In order to keep great performance, also pls stay away from assembling as well limited or way too unfastened. 
3)Reducer should be mounted to machines stably to steer clear of vibration.
4)Each time achievable,shield the reducer towards solar radiation and undesirable weather.
5)In the scenario of specifically lengthy time period of storage(4-six months), if the oil seal is not immersed in lubricant inside of the device, it is recommended to modify it considering that the rubber could stick to the shaft or may even have dropped the elasticity.
6)Painting must certainly not go over rubber elements and the holes on breather plug if any.
seven)When hook up with hollow or sound shaft, pls grease the joint to avoid lock or oxidation.
8)Verify the correct lubricant stage through indicator if there is a single.
nine)CZPTting must consider location gradually, CZPT instantly implementing the maximum load.
10)When utilizing a variety of of motors to match reducer directly, supporting unit is required if motor is as well heavy.
eleven)Ensure good warmth dissipation by maintaining good air flow in close proximity to the motor admirer.
twelve)In the circumstance of ambient temperature40ºC, pls contact the technical section.

Soon after Product sales Services

1.Servicing Time and Guarantee:Inside 1 12 months following receiving goods.
two.Other SupportWhich includes modeling assortment guidebook, set up information, and issue resolution manual, etc.

FAQ

1.Q:Can you make as per buyer drawing?
   A: Sure, we supply CZPT service for customers appropriately. We can use customer’s nameplate for gearboxes.
two.Q:What is your phrases of payment ?
   A: thirty% deposit before production,harmony T/T prior to delivery.
3.Q:Are you a trading organization or producer?
   A:We are a manufacurer with CZPTd equipment and experienced staff.
four.Q:What’s your generation capability?
   A:8000-9000 PCS/Month
five.Q:Totally free sample is CZPT or not?
   A:Indeed, we can supply cost-free sample if buyer concur to pay for the courier price
six.Q:Do you have any certification?
   A:Indeed, we have CE certificate and SGS certification report.

Speak to information:
Ms Lingel Pan
For any queries just feel free of charge ton get in touch with me. A lot of many thanks for your sort attention to our business!

Double Input Shaft Worm CZPT Good Quality and Long Lifespan