Excellent Construction Enables Gearbox

Excellent CZPT Enables CZPT

CZPTshine CZPT Cycloid Geared Motor Traits

1. Attributes:
one. Smooth operating,lower noise gear tooth needle more engagement.
2. Cycloidal tooth profile gives a large contact ratio to stand up to overload shocks
three. Compact dimensions: one ratio CZPT from 1/9 to one/87, double phase up from 1/ninety nine to one/7569 
4. Perfect for dynamic applications: regular start off-quit-reversing duties fits for cyclo speed reducer given that inertia is lower
5. Minimize routine maintenance costs: high trustworthiness, extended daily life, minimal routine maintenance in comparison to conventional gearboxes
6. Internal components replaceable with other manufacturers to ensure running.

7. Grease Lubricated & Oil Lubricated Types Obtainable
8. Output Shaft Rotation Path: Solitary Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
9. Ambient Problems: Indoor Set up:ten-forty Celsius, Max 85% Humidity, Underneath 1000m Altitude, Effectively Ventilated Atmosphere, Free of corrosive,        explosive gases, vapors and dust
10.Gradual Pace Shaft Direction: Horizontal, Vertical Up & Down, CZPT Route
eleven.Mounting Fashion: Foot Mount, Flange Mount & Vertical F-flange Mount,
12. Enter Relationship: Cyclo Integral Motor, Hollow Enter Shaft Adapter
thirteen. Coupling Strategy With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
14. Cycloid reducer Ability Assortment: .37kW ~ 11kW

two. CZPT parameters

Variety Previous Variety Output Torque Output Shaft Dia.
SXJ00 JXJ00 98N.m φ30
SXJ01 JXJ01 221N.m φ35
SXJ02 JXJ02 448N.m φ45
SXJ03 JXJ03 986N.m φ55
SXJ04 JXJ04 1504N.m φ70
SXJ05 JXJ05 3051N.m φ90
SXJ06 JXJ06 5608N.m φ100

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned military mould business, was set up in 1965. CZPTshine specializes in the full power transmission resolution for large-conclude gear producing industries based mostly on the purpose of “System Product, Application Design and style and Skilled Services”.
CZPTshine have a strong complex pressure with above 350 personnel at present, such as more than thirty engineering specialists, thirty quality inspectors, masking an spot of 80000 square meters and types of CZPTd processing equipment and testing equipments. We have a good foundation for the sector software development and support of higher-end speed reducers & variators possessing to the provincial engineering technology study heart,the lab of equipment pace reducers, and the base of modern day R&D.

Our Staff

High quality Control
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
product is a product inspection to determine the qualified products.

7. Certification.

Packing

Shipping

 

Excellent CZPT Enables CZPT