F Series Helical Gear Reducer, Geared Motor, Gearbox

F Series Helical Gear Reducer, Geared Motor, CZPT

F collection Parallel Shaft-CZPTcal Geared Motor Attributes

one.Functions:

  1. Large effectiveness: 92%-94%
  2. Parallel output, compact construction, large output torque, sleek procedure, minimal noise and prolonged service lifestyle.
  3. Substantial precision: the gear is manufactured of higher-high quality alloy steel forging, carbonitriding and hardening treatment method, grinding method to guarantee higher precision and steady running.
  4. Large interchangeability: highly modular, serial style, powerful flexibility and interchangeability.

2. CZPT parameters

Ratio 3.77-276.77
Input power .12-200KW
Output torque three.five-21700N.m
Output pace 5-352rpm
Mounting variety Foot mounted, foot mounted with sound shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. 
Input Strategy Flange enter(AM), shaft input(Advertisement), inline AC motor enter, or AQA servo motor
Brake Release HF-manual launch(lock in the brake launch placement), HR-guide launch(autom-atic braking position)
Thermistor TF(Thermistor defense PTC thermisto)
TH(Thermistor safety Bimetal swotch)
Mounting Position M1, M2, M3, M4, M5, M6
Variety F37-F157
Output shaft dis. 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm
Housing material HT200 high-energy forged iron from R37,forty seven,57,sixty seven,seventy seven,87
Housing content HT250 Substantial strength cast iron from R97 107,137,147,
157,167,187
Heat treatment technology carbonitriding and hardening treatment
Efficiency 92%-ninety four%
Lubricant VG220
Defense Course IP55, F class

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned armed forces mould organization, was proven in 1965. CZPTshine specializes in the comprehensive electrical power transmission solution for substantial-stop products manufacturing industries primarily based on the goal of “Platform Item, Application Design and style and Specialist Service”.
CZPTshine have a sturdy technological power with in excess of 350 personnel at present, such as over thirty engineering technicians, thirty quality inspectors, masking an spot of 80000 sq. meters and kinds of CZPTd processing machines and screening equipments. We have a great basis for the sector application development and service of higher-conclude speed reducers & variators owning to the provincial engineering technological innovation research heart,the lab of gear pace reducers, and the base of present day R&D.

Our Staff

High quality Management
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
solution is a product inspection to determine the qualified products.

7. Certification.
All our goods get ISO & CE & UL certification.

Packing

Supply

F Series Helical Gear Reducer, Geared Motor, CZPT