F series Parallel Shaft-CZPTcal Geared Motor Traits
1.Features:
- Substantial performance: ninety two%-ninety four%
- Parallel output, compact framework, massive output torque, easy procedure, reduced noise and lengthy support existence.
- Large precision: the equipment is produced of substantial-good quality alloy metal forging, carbonitriding and hardening treatment method, grinding approach to make certain large precision and stable working.
- High interchangeability: highly modular, serial design and style, sturdy versatility and interchangeability.
2. CZPT parameters
Ratio | three.77-276.77 |
Input electrical power | .12-200KW |
Output torque | 3.5-21700N.m |
Output speed | 5-352rpm |
Mounting sort | Foot mounted, foot mounted with strong shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Enter Strategy | Flange enter(AM), shaft input(Advertisement), inline AC motor enter, or AQA servo motor |
Brake Release | HF-guide release(lock in the brake launch place), HR-guide launch(autom-atic braking place) |
Thermistor | TF(Thermistor defense PTC thermisto) TH(Thermistor safety Bimetal swotch) |
Mounting Situation | M1, M2, M3, M4, M5, M6 |
Type | F37-F157 |
Output shaft dis. | 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm |
Housing material | HT200 large-power cast iron from R37,forty seven,57,sixty seven,seventy seven,87 |
Housing materials | HT250 High power cast iron from R97 107,137,147, 157,167,187 |
Heat treatment technology | carbonitriding and hardening remedy |
Efficiency | ninety two%-94% |
Lubricant | VG220 |
Security Course | IP55, F class |
CZPTshine CZPT
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned navy mould business, was proven in 1965. CZPTshine specializes in the complete power transmission solution for high-stop equipment production industries primarily based on the intention of “Platform Solution, Application Layout and Skilled Support”.
CZPTshine have a sturdy technological power with more than 350 employees at present, such as in excess of thirty engineering technicians, thirty good quality inspectors, covering an spot of 80000 square meters and varieties of CZPTd processing equipment and screening equipments. We have a good foundation for the sector software development and support of large-stop speed reducers & variators possessing to the provincial engineering technological innovation research center,the lab of equipment speed reducers, and the base of modern day R&D.
Our Team
Quality Control
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
solution is a product inspection to determine the qualified products.
7. Certification.
All our goods get ISO & CE & UL certification.
Packing
Supply