Fail-Safe Reliability Gearbox

Fail-Safe Reliability CZPT

CZPTshine CZPT Cycloid Geared Motor Characteristics

1. Features:
one. Smooth managing,reduced sounds equipment tooth needle more engagement.
two. Cycloidal tooth profile gives a higher contact ratio to face up to overload shocks
three. Compact measurement: solitary ratio CZPT from one/9 to 1/87, double stage up from 1/99 to 1/7569 
4. Best for dynamic apps: recurrent commence-cease-reversing responsibilities satisfies for cyclo velocity reducer considering that inertia is low
five. Minimize servicing expenses: higher reliability, prolonged lifestyle, minimal routine maintenance in contrast to standard gearboxes
six. Internal areas replaceable with other brands to guarantee managing.

seven. Grease Lubricated & Oil Lubricated Versions Offered
8. Output Shaft Rotation Route: One Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
9. Ambient Situations: Indoor Set up:ten-40 Celsius, Max eighty five% Humidity, Under 1000m Altitude, Well Ventilated Environment, Free of corrosive,        explosive gases, vapors and dust
ten.Slow Pace Shaft Route: Horizontal, Vertical Up & Down, CZPT Direction
eleven.Mounting Design: Foot Mount, Flange Mount & Vertical F-flange Mount,
twelve. Input Connection: Cyclo Integral Motor, Hollow Enter Shaft Adapter
13. Coupling Approach With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
14. Cycloid reducer Ability Range: .37kW ~ 11kW

2. CZPT parameters

Sort Old Sort Output Torque Output Shaft Dia.
SXJ00 JXJ00 98N.m φ30
SXJ01 JXJ01 221N.m φ35
SXJ02 JXJ02 448N.m φ45
SXJ03 JXJ03 986N.m φ55
SXJ04 JXJ04 1504N.m φ70
SXJ05 JXJ05 3051N.m φ90
SXJ06 JXJ06 5608N.m φ100

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned navy mould organization, was set up in 1965. CZPTshine specializes in the total energy transmission answer for large-finish tools production industries dependent on the purpose of “Platform Merchandise, Software Layout and Expert Service”.
CZPTshine have a powerful specialized drive with over 350 workers at existing, which includes above thirty engineering experts, 30 top quality inspectors, covering an location of 80000 sq. meters and varieties of CZPTd processing equipment and screening equipments. We have a good basis for the sector application growth and service of high-conclude speed reducers & variators owning to the provincial engineering technological innovation study heart,the lab of gear velocity reducers, and the base of modern day R&D.

Our Team

Top quality Management
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
solution is a product inspection to determine the qualified products.

7. Certification.

Packing

Supply

 

Fail-Safe Reliability CZPT

Tags:gearbox