Flange Mounted Helical Gearbox

Flange Mounted Helical CZPT

F sequence Parallel Shaft-CZPTcal Geared Motor Traits

one.Attributes:

  1. Large efficiency: ninety two%-ninety four%
  2. Parallel output, compact framework, massive output torque, smooth procedure, minimal noise and extended provider life.
  3. Higher precision: the gear is made of higher-quality alloy steel forging, carbonitriding and hardening remedy, grinding method to make sure higher precision and secure running.
  4. Substantial interchangeability: extremely modular, serial style, powerful flexibility and interchangeability.

two. CZPT parameters

Ratio 3.77-276.77
Input energy .twelve-200KW
Output torque three.5-21700N.m
Output velocity 5-352rpm
Mounting variety Foot mounted, foot mounted with solid shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. 
Enter Technique Flange input(AM), shaft input(Advertisement), inline AC motor input, or AQA servo motor
Brake Release HF-manual release(lock in the brake launch situation), HR-guide release(autom-atic braking place)
Thermistor TF(Thermistor security PTC thermisto)
TH(Thermistor defense Bimetal swotch)
Mounting Situation M1, M2, M3, M4, M5, M6
Kind F37-F157
Output shaft dis. 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm
Housing materials HT200 large-toughness forged iron from R37,47,57,sixty seven,seventy seven,87
Housing material HT250 Large power cast iron from R97 107,137,147,
157,167,187
Heat treatment technology carbonitriding and hardening therapy
Effectiveness 92%-ninety four%
Lubricant VG220
Security Course IP55, F class

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned armed forces mould business, was established in 1965. CZPTshine specializes in the comprehensive energy transmission answer for high-end products producing industries based mostly on the goal of “System Item, Application Design and style and Expert Service”.
CZPTshine have a robust technical pressure with over 350 staff at present, including in excess of thirty engineering technicians, 30 high quality inspectors, masking an location of 80000 square meters and kinds of CZPTd processing machines and tests equipments. We have a good basis for the business application improvement and provider of higher-conclude pace reducers & variators proudly owning to the provincial engineering engineering analysis middle,the lab of gear speed reducers, and the foundation of present day R&D.

Our Group

Top quality Control
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
merchandise is a product inspection to determine the qualified products.

7. Certification.
All our products get ISO & CE & UL certification.

Packing

Delivery

Flange Mounted Helical CZPT