Flange Mounting Cycloidal Gearbox with Big Torque

Flange Mounting Cycloidal CZPT with Big Torque

CZPTshine CZPT Cycloid Geared Motor Traits

one. Features:
1. Smooth running,low noise equipment tooth needle more engagement.
2. Cycloidal tooth profile supplies a substantial get in touch with ratio to face up to overload shocks
three. Compact dimension: single ratio CZPT from one/9 to 1/87, double phase up from 1/99 to one/7569 
four. Excellent for dynamic apps: repeated begin-cease-reversing obligations suits for cyclo velocity reducer given that inertia is reduced
5. Minimize upkeep fees: high dependability, lengthy life, minimal servicing in comparison to standard gearboxes
six. Inside components replaceable with other makes to guarantee operating.

7. Grease Lubricated & Oil Lubricated Models Accessible
eight. Output Shaft Rotation Course: Solitary Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
9. Ambient Conditions: Indoor Installation:10-40 Celsius, Max 85% Humidity, Below 1000m Altitude, Nicely Ventilated Environment, Cost-free of corrosive,        explosive gases, vapors and dust
10.Slow Velocity Shaft Route: Horizontal, Vertical Up & Down, CZPT Path
eleven.Mounting Fashion: Foot Mount, Flange Mount & Vertical F-flange Mount,
twelve. Input Relationship: Cyclo Integral Motor, Hollow Enter Shaft Adapter
thirteen. Coupling Approach With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
fourteen. Cycloid reducer Potential Selection: .37kW ~ 11kW

2. CZPT parameters

Variety Aged Kind Output Torque Output Shaft Dia.
SXJ00 JXJ00 98N.m φ30
SXJ01 JXJ01 221N.m φ35
SXJ02 JXJ02 448N.m φ45
SXJ03 JXJ03 986N.m φ55
SXJ04 JXJ04 1504N.m φ70
SXJ05 JXJ05 3051N.m φ90
SXJ06 JXJ06 5608N.m φ100

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned navy mould enterprise, was set up in 1965. CZPTshine specializes in the comprehensive energy transmission answer for higher-finish equipment manufacturing industries dependent on the aim of “System Solution, Software Layout and Professional Service”.
CZPTshine have a sturdy complex pressure with over 350 staff at present, which includes in excess of thirty engineering specialists, 30 good quality inspectors, covering an spot of 80000 sq. meters and types of CZPTd processing equipment and tests equipments. We have a excellent basis for the industry application development and support of high-stop pace reducers & variators possessing to the provincial engineering technology analysis heart,the lab of gear speed reducers, and the foundation of modern day R&D.

Our Staff

High quality Control
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
product is a product inspection to determine the qualified products.

7. Certification.

Packing

Delivery

 

Flange Mounting Cycloidal CZPT with Big Torque