Foot Mounted Planetary Reducer Gearbox

Foot Mounted Planetary Reducer CZPT

JWB Sequence Speed Variator 
one. Attributes:

 JWB-X  type

  • Sizes: ≥04
  • Power up to 1.5 kW or more
  • Cases in RAL 5571 blue cast iron
  • Shafts: scenario hardened and tempered steel.
  • Internal factors: warmth-dealt with steel
  • Output velocity with four pole(1400r/min) motors: 2-10r/min4.seven-23.5r/min15-75r/min20-100r/min, 28-140r/min, thirty-150r/min40-200r/min60-300r/min80-400r/min100-500r/min190-950r/min.
  • Output Torque value max 1002Nm
  • CZPT, vibration-totally free managing
  • Bidirectional rotation
  • Control handwheel positionable on both side
  • Slipping velocity to max load at 5% 
  • Regulation sensibility: ,five rpm 
  • Painted with blue epoxy-polyester powder 

 JWB-X B sort

  • Dimensions:01,02,03 and 04
  • Energy up to 1.5 kW or considerably less
  • Situations in die-solid aluminium alloy
  • Shafts: scenario hardened and tempered steel.
  • Internal factors: warmth-treated steel
  • Output speed with four pole(1400r/min) motors: 2r/min-20r/min4.7r/min-23.5r/min6.5-32.5r/min, eight-40r/min, 9-45r/min, 13-65r/min, 15r/min-75r/min18-90r/min, twenty five-125r/min, 28r/min-140r/min40r/min-200r/min60r/min-300r/min80r/min-400r/min100r/min-500r/min190r/min-950r/min.
  • Output Torque worth max 795 Nm
  • CZPT, vibration-totally free working
  • Bidirectional rotation
  • Handle hand wheel positionable on possibly side
  • Slipping velocity to max load at 5%
  • Regulation sensibility: ,5 rpm
  • Painted with blue epoxy-polyester powder 

two. CZPT parameters

 

Kind Output Torque Output Shaft Dia.   Output Pace Range 2rpm-950rpm
SWB01 2.six-1.6N.m φ11 Relevant Motor Energy .18kW-seven.5kW
SWB02 258-one.8N.m φ14,φ24,φ28,φ32  
SWB03 426-4N.m φ24,φ28,φ38 Input Choices With Inline AC Motor
SWB04 795-8N.m φ28,φ38,φ42 With IEC Motor
SWB05 535-16N.m φ38,φ48,φ55 With Input Shaft
SWB06 1002-40N.m φ42,φ55,φ70 With Enter Flange

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned army mould enterprise, was set up in 1965. CZPTshine specializes in the full electricity transmission answer for higher-conclude gear producing industries dependent on the intention of “Platform Item, Application Design and style and Specialist Provider”.
CZPTshine have a sturdy specialized pressure with over 350 personnel at existing, like over thirty engineering professionals, thirty quality inspectors, covering an area of 80000 square meters and varieties of CZPTd processing machines and screening equipments. We have a great basis for the industry application growth and provider of large-finish pace reducers & variators owning to the provincial engineering technologies research center,the lab of gear speed reducers, and the base of modern day R&D.

Our Staff

High quality Control
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
merchandise is a product inspection to determine the qualified products.

7. Certification.

Packing

Shipping

Foot Mounted Planetary Reducer CZPT