RV collection Characteristics
- RV – Dimensions:030-040-050-063-075-one zero five-one hundred ten-130-150
- Input Alternatives: with enter shaft, With Square flange,With Input Flange
- Enter Power .06 to 11 kW
- RV-Dimension from 030 to 105 in die-solid aluminium alloy budy and more than a hundred and ten in forged iron
- Ratios between 5 and 100
- Max torque 1550 N.m and admissible output radial hundreds max 8771 N
- Aluminium models are provided comprehensive with artificial oil and allow for common mounting positions, with no need to have to modify lubricant quantity
- Worm wheel: Copper (KK Cu).
- Loading potential in accordance with: ISO 9001:2015/GB/T 19001-2016
- Dimensions 030 and over are painted with RAL 5571 blue
- Worm equipment reducers are CZPT with diffferent mixtures: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
- NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
- Possibilities: torque arm, output flange, viton oil seals, low/substantial temperature oil, filling/drain/breather/level plug,Tiny gap
Basic models can be used to a broad selection of electricity reduction ratios from five to one thousand.
Guarantee: One year from date of shipping and delivery.
WORM GEARBOX | |||||
SNW SERIES | Output Velocity Variety: | ||||
Sort | Old Type | Output Torque | Output Shaft Dia. | 14rpm-280rpm | |
SNW030 | RV030 | 21N.m | φ14 | Relevant Motor Electricity: | |
SNW040 | RV040 | 45N.m | φ19 | .06kW-11kW | |
SNW050 | RV050 | 84N.m | φ25 | Enter Options1: | |
SNW063 | RV063 | 160N.m | φ25 | With Inline AC Motor | |
SNW075 | RV075 | 230N.m | φ28 | Enter Options2: | |
SNW090 | RV090 | 410N.m | φ35 | With Sq. flange | |
SNW105 | RV105 | 630N.m | φ42 | Enter Options3: | |
SNW110 | RV110 | 725N.m | φ42 | With Input Shaft | |
SNW130 | RV130 | 1050N.m | φ45 | Enter Options4: | |
SNW150 | RV150 | 1550N.m | φ50 | With Input Flange |
CZPTshine CZPT
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned armed forces mould organization, was proven in 1965. CZPTshine specializes in the complete electricity transmission solution for high-finish equipment manufacturing industries based mostly on the goal of “System Item, Application Style and Professional Service”.
CZPTshine have a sturdy specialized force with in excess of 350 staff at current, such as over thirty engineering specialists, 30 top quality inspectors, masking an spot of 80000 sq. meters and kinds of CZPTd processing devices and testing equipments. We have a good basis for the business software improvement and provider of higher-end velocity reducers & variators owning to the provincial engineering technology analysis heart,the lab of equipment pace reducers, and the base of contemporary R&D.
Our Team
Quality Manage
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
is a product inspection to determine the qualified products.
Packing
Supply