S sequence CZPTcal Geared Motor Qualities
one. Features:
- Large performance: seventy five%-80%
- Substantial engineering: the helical equipment and a worm equipment blended with an integrated transmission to enhance the torque and efficiency.
- Large precision: the gear is made of high-quality alloy metal forging, carbonitriding and hardening treatment, grinding approach to guarantee substantial precision and secure managing.
- Substantial interchangeability: very modular, serial design, sturdy versatility and interchangeability.
two. CZPT parameters
Ratio | 6.eight-288 |
Input power | .12-22KW |
Output torque | 11-4530N.m |
Output speed | 5-206rpm |
Mounting type | Foot mounted, foot mounted with reliable shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined gap, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Input Technique | Flange input(AM), shaft input(Advertisement), inline AC motor enter, or AQA servo motor |
Brake Launch | HF-manual release(lock in the brake launch position), HR-handbook launch(autom-atic braking placement) |
Thermistor | TF(Thermistor security PTC thermisto) TH(Thermistor safety Bimetal swotch) |
Mounting Position | M1, M2, M3, M4, M5, M6 |
Variety | S37-S97 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, |
Housing content | HT200 large-energy solid iron from R37,forty seven,fifty seven,67,seventy seven,87 |
Housing material | HT250 Substantial power forged iron from R97 107,137,147, 157,167,187 |
Heat treatment technology | carbonitriding and hardening treatment method |
One Stage Performance | 75%-eighty% |
Lubricant | VG220 |
Security Course | IP55, F class |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned navy mould business, was established in 1965. CZPTshine specializes in the total power transmission solution for higher-end equipment production industries primarily based on the intention of “Platform Item, Software Style and Professional Service”.
CZPTshine have a robust technical pressure with above 350 personnel at existing, like more than thirty engineering professionals, 30 high quality inspectors, covering an location of 80000 square meters and types of CZPTd processing machines and tests equipments. We have a very good foundation for the industry software growth and provider of high-stop pace reducers & variators owning to the provincial engineering technological innovation investigation center,the lab of equipment velocity reducers, and the base of modern R&D.
Our Staff
Quality Control
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
solution is a product inspection to determine the qualified products.
7. Certification.
Packing
Shipping and delivery