JWB Series Pace Variator
one. Functions:
JWB-X type
- Measurements: ≥04
- Power up to 1.5 kW or far more
- Cases in RAL 5571 blue cast iron
- Shafts: scenario hardened and tempered steel.
- Inner components: heat-treated metal
- Output pace with four pole(1400r/min) motors: 2-10r/min4.seven-23.5r/min15-75r/min20-100r/min, 28-140r/min, 30-150r/min40-200r/min60-300r/min80-400r/min100-500r/min190-950r/min.
- Output Torque worth max 1002Nm
- CZPT, vibration-cost-free operating
- Bidirectional rotation
- Management handwheel positionable on both aspect
- Slipping velocity to max load at 5%
- Regulation sensibility: ,five rpm
- Painted with blue epoxy-polyester powder
JWB-X B variety
- Measurements:01,02,03 and 04
- Electricity up to 1.5 kW or considerably less
- Circumstances in die-forged aluminium alloy
- Shafts: scenario hardened and tempered steel.
- Inner elements: heat-dealt with steel
- Output velocity with four pole(1400r/min) motors: 2r/min-20r/min4.7r/min-23.5r/min6.five-32.5r/min, 8-40r/min, nine-45r/min, thirteen-65r/min, 15r/min-75r/min18-90r/min, 25-125r/min, 28r/min-140r/min40r/min-200r/min60r/min-300r/min80r/min-400r/min100r/min-500r/min190r/min-950r/min.
- Output Torque worth max 795 Nm
- CZPT, vibration-free operating
- Bidirectional rotation
- Management hand wheel positionable on possibly side
- Slipping speed to max load at 5%
- Regulation sensibility: ,five rpm
- Painted with blue epoxy-polyester powder
2. CZPT parameters
Variety | Output Torque | Output Shaft Dia. | Output Speed Variety | 2rpm-950rpm | |
SWB01 | 2.six-one.6N.m | φ11 | Applicable Motor Power | .18kW-7.5kW | |
SWB02 | 258-one.8N.m | φ14,φ24,φ28,φ32 | |||
SWB03 | 426-4N.m | φ24,φ28,φ38 | Enter Choices | With Inline AC Motor | |
SWB04 | 795-8N.m | φ28,φ38,φ42 | With IEC Motor | ||
SWB05 | 535-16N.m | φ38,φ48,φ55 | With Input Shaft | ||
SWB06 | 1002-40N.m | φ42,φ55,φ70 | With Input Flange |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned military mould company, was established in 1965. CZPTshine specializes in the comprehensive electricity transmission answer for high-finish products manufacturing industries dependent on the intention of “System Merchandise, Application Design and Professional Services”.
CZPTshine have a strong technological power with above 350 workers at present, such as in excess of 30 engineering experts, 30 top quality inspectors, covering an region of 80000 square meters and types of CZPTd processing devices and testing equipments. We have a very good foundation for the market software growth and services of large-stop velocity reducers & variators possessing to the provincial engineering technologies investigation heart,the lab of equipment speed reducers, and the foundation of present day R&D.
Our Staff
Quality Handle
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
solution is a product inspection to determine the qualified products.
seven. Certification.
Packing
Shipping and delivery