High Quality Speed Reducer for Packaging Machinery

High Quality Speed Reducer for Packaging CZPTry

JWB Collection Velocity Variator 
1. Attributes:

 JWB-X  type

  • Measurements: ≥04
  • Power up to 1.5 kW or far more
  • Instances in RAL 5571 blue cast iron
  • Shafts: case hardened and tempered metal.
  • Interior factors: heat-dealt with metal
  • Output velocity with four pole(1400r/min) motors: 2-10r/min4.seven-23.5r/min15-75r/min20-100r/min, 28-140r/min, thirty-150r/min40-200r/min60-300r/min80-400r/min100-500r/min190-950r/min.
  • Output Torque worth max 1002Nm
  • CZPT, vibration-free of charge managing
  • Bidirectional rotation
  • Control handwheel positionable on possibly side
  • Slipping pace to max load at five% 
  • Regulation sensibility: ,five rpm 
  • Painted with blue epoxy-polyester powder 

 JWB-X B type

  • Sizes:01,02,03 and 04
  • Power up to 1.5 kW or significantly less
  • Situations in die-forged aluminium alloy
  • Shafts: circumstance hardened and tempered steel.
  • Internal factors: heat-handled steel
  • Output pace with four pole(1400r/min) motors: 2r/min-20r/min4.7r/min-23.5r/min6.five-32.5r/min, eight-40r/min, nine-45r/min, 13-65r/min, 15r/min-75r/min18-90r/min, twenty five-125r/min, 28r/min-140r/min40r/min-200r/min60r/min-300r/min80r/min-400r/min100r/min-500r/min190r/min-950r/min.
  • Output Torque benefit max 795 Nm
  • CZPT, vibration-totally free working
  • Bidirectional rotation
  • Handle hand wheel positionable on either facet
  • Slipping pace to max load at 5%
  • Regulation sensibility: ,five rpm
  • Painted with blue epoxy-polyester powder 

2. CZPT parameters

 

Variety Output Torque Output Shaft Dia.   Output Speed Range 2rpm-950rpm
SWB01 2.six-one.6N.m φ11 Relevant Motor Electricity .18kW-seven.5kW
SWB02 258-one.8N.m φ14,φ24,φ28,φ32  
SWB03 426-4N.m φ24,φ28,φ38 Enter Alternatives With Inline AC Motor
SWB04 795-8N.m φ28,φ38,φ42 With IEC Motor
SWB05 535-16N.m φ38,φ48,φ55 With Input Shaft
SWB06 1002-40N.m φ42,φ55,φ70 With Input Flange

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned armed forces mould enterprise, was proven in 1965. CZPTshine specializes in the total power transmission resolution for higher-conclude equipment production industries based on the aim of “System Product, Application Layout and Professional Provider”.
CZPTshine have a strong technological pressure with above 350 workers at present, like over thirty engineering technicians, thirty high quality inspectors, covering an area of 80000 sq. meters and sorts of CZPTd processing equipment and testing equipments. We have a excellent basis for the business software development and provider of substantial-end velocity reducers & variators possessing to the provincial engineering technology analysis middle,the lab of equipment velocity reducers, and the foundation of contemporary R&D.

Our Crew

Quality Management
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
solution is a product inspection to determine the qualified products.

7. Certification.

Packing

Shipping

High Quality Speed Reducer for Packaging CZPTry