S sequence CZPTcal Geared Motor Traits
1. Functions:
- High efficiency: seventy five%-80%
- Higher technological innovation: the helical equipment and a worm gear blended with an integrated transmission to increase the torque and performance.
- Substantial precision: the equipment is created of large-top quality alloy metal forging, carbonitriding and hardening treatment, grinding process to make certain large precision and stable managing.
- High interchangeability: highly modular, serial design, sturdy versatility and interchangeability.
2. CZPT parameters
Ratio | six.8-288 |
Input power | .12-22KW |
Output torque | 11-4530N.m |
Output pace | 5-206rpm |
Mounting sort | Foot mounted, foot mounted with solid shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Input Method | Flange input(AM), shaft enter(Advertisement), inline AC motor input, or AQA servo motor |
Brake Launch | HF-handbook launch(lock in the brake launch situation), HR-guide release(autom-atic braking placement) |
Thermistor | TF(Thermistor security PTC thermisto) TH(Thermistor protection Bimetal swotch) |
Mounting Position | M1, M2, M3, M4, M5, M6 |
Type | S37-S97 |
Output shaft dis. | 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, |
Housing material | HT200 substantial-toughness forged iron from R37,47,fifty seven,67,77,87 |
Housing content | HT250 High strength cast iron from R97 107,137,147, 157,167,187 |
Heat treatment technology | carbonitriding and hardening remedy |
One Stage Efficiency | 75%-eighty% |
Lubricant | VG220 |
Defense Course | IP55, F class |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned armed forces mould organization, was established in 1965. CZPTshine specializes in the total electricity transmission solution for large-end gear manufacturing industries dependent on the intention of “Platform Item, Application Design and style and Skilled Provider”.
CZPTshine have a robust technological pressure with over 350 staff at current, like more than 30 engineering specialists, 30 high quality inspectors, covering an region of 80000 sq. meters and varieties of CZPTd processing machines and testing equipments. We have a good basis for the business application advancement and provider of higher-conclude velocity reducers & variators owning to the provincial engineering technological innovation investigation middle,the lab of equipment pace reducers, and the foundation of modern R&D.
Our Group
Quality Control
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
product is a product inspection to determine the qualified products.
seven. Certification.
Packing
Shipping