JWB Sequence Speed Variator
1. Attributes:
JWB-X type
- Measurements: ≥04
- Power up to 1.5 kW or a lot more
- Situations in RAL 5571 blue cast iron
- Shafts: scenario hardened and tempered metal.
- Interior components: warmth-treated steel
- Output speed with 4 pole(1400r/min) motors: 2-10r/min4.seven-23.5r/min15-75r/min20-100r/min, 28-140r/min, thirty-150r/min40-200r/min60-300r/min80-400r/min100-500r/min190-950r/min.
- Output Torque value max 1002Nm
- CZPT, vibration-totally free managing
- Bidirectional rotation
- Handle handwheel positionable on either facet
- Slipping pace to max load at 5%
- Regulation sensibility: ,5 rpm
- Painted with blue epoxy-polyester powder
JWB-X B variety
- Sizes:01,02,03 and 04
- Power up to 1.5 kW or much less
- Instances in die-solid aluminium alloy
- Shafts: case hardened and tempered metal.
- Inside parts: warmth-dealt with metal
- Output pace with 4 pole(1400r/min) motors: 2r/min-20r/min4.7r/min-23.5r/min6.5-32.5r/min, 8-40r/min, 9-45r/min, thirteen-65r/min, 15r/min-75r/min18-90r/min, 25-125r/min, 28r/min-140r/min40r/min-200r/min60r/min-300r/min80r/min-400r/min100r/min-500r/min190r/min-950r/min.
- Output Torque worth max 795 Nm
- CZPT, vibration-totally free working
- Bidirectional rotation
- Manage hand wheel positionable on either facet
- Slipping velocity to max load at five%
- Regulation sensibility: ,five rpm
- Painted with blue epoxy-polyester powder
2. CZPT parameters
Kind | Output Torque | Output Shaft Dia. | Output Velocity Assortment | 2rpm-950rpm | |
SWB01 | 2.six-one.6N.m | φ11 | Applicable Motor Electrical power | .18kW-7.5kW | |
SWB02 | 258-1.8N.m | φ14,φ24,φ28,φ32 | |||
SWB03 | 426-4N.m | φ24,φ28,φ38 | Enter Alternatives | With Inline AC Motor | |
SWB04 | 795-8N.m | φ28,φ38,φ42 | With IEC Motor | ||
SWB05 | 535-16N.m | φ38,φ48,φ55 | With Input Shaft | ||
SWB06 | 1002-40N.m | φ42,φ55,φ70 | With Enter Flange |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned armed forces mould company, was established in 1965. CZPTshine specializes in the full power transmission solution for higher-stop products producing industries based mostly on the aim of “System Item, Software Style and Specialist Support”.
CZPTshine have a strong technological drive with over 350 staff at present, like in excess of 30 engineering experts, 30 top quality inspectors, covering an area of 80000 sq. meters and sorts of CZPTd processing machines and tests equipments. We have a great foundation for the industry software advancement and provider of high-end speed reducers & variators possessing to the provincial engineering technological innovation study middle,the lab of equipment speed reducers, and the foundation of modern day R&D.
Our Crew
Good quality Management
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
product is a product inspection to determine the qualified products.
7. Certification.
Packing
Shipping and delivery