Impact Resistance Cycloidal Gearbox for Ceramic Industry

Impact Resistance Cycloidal CZPT for Ceramic CZPT

CZPTshine CZPT Cycloid Geared Motor Attributes

one. Functions:
1. Smooth working,lower sound gear tooth needle more engagement.
two. Cycloidal tooth profile provides a large get in touch with ratio to face up to overload shocks
3. Compact dimension: solitary ratio CZPT from one/9 to 1/87, double phase up from 1/ninety nine to one/7569 
four. Ideal for dynamic applications: frequent start off-quit-reversing duties satisfies for cyclo speed reducer since inertia is reduced
five. Decrease servicing fees: higher trustworthiness, extended daily life, minimal maintenance in comparison to standard gearboxes
6. Inner elements replaceable with other brands to make certain operating.

7. Grease Lubricated & Oil Lubricated Versions Obtainable
8. Output Shaft Rotation Course: Single Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
9. Ambient Situations: Indoor Set up:10-40 Celsius, Max 85% Humidity, Under 1000m Altitude, Effectively Ventilated Atmosphere, Totally free of corrosive,        explosive gases, vapors and dust
10.Sluggish Speed Shaft Route: Horizontal, Vertical Up & Down, CZPT Direction
eleven.Mounting Type: Foot Mount, Flange Mount & Vertical F-flange Mount,
twelve. Enter Link: Cyclo Integral Motor, Hollow Enter Shaft Adapter
13. Coupling Technique With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
fourteen. Cycloid reducer Ability Selection: .37kW ~ 11kW

2. CZPT parameters

Variety Previous Type Output Torque Output Shaft Dia.
SXJ00 JXJ00 98N.m φ30
SXJ01 JXJ01 221N.m φ35
SXJ02 JXJ02 448N.m φ45
SXJ03 JXJ03 986N.m φ55
SXJ04 JXJ04 1504N.m φ70
SXJ05 JXJ05 3051N.m φ90
SXJ06 JXJ06 5608N.m φ100

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned army mould organization, was established in 1965. CZPTshine specializes in the total energy transmission solution for large-conclude gear manufacturing industries based mostly on the aim of “Platform Merchandise, Software Design and style and Expert Services”.
CZPTshine have a strong specialized drive with over 350 employees at existing, including in excess of 30 engineering specialists, 30 top quality inspectors, masking an spot of 80000 sq. meters and varieties of CZPTd processing equipment and testing equipments. We have a good foundation for the business software improvement and services of large-conclude velocity reducers & variators owning to the provincial engineering technological innovation analysis center,the lab of gear velocity reducers, and the foundation of modern R&D.

Our Team

Quality Control
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
product is a product inspection to determine the qualified products.

seven. Certification.

Packing

Shipping and delivery

 

Impact Resistance Cycloidal CZPT for Ceramic CZPT