Impact Resistance Cycloidal Gearbox

Impact Resistance Cycloidal CZPT

CZPTshine CZPT Cycloid Geared Motor Attributes

1. Attributes:
 1. Smooth working,lower sounds gear tooth needle much more engagement.
2. Cycloidal tooth profile provides a high make contact with ratio to withstand overload shocks
three. Compact dimensions: single ratio CZPT from 1/9 to 1/87, double stage up from 1/99 to one/7569 
4. Perfect for dynamic applications: frequent begin-stop-reversing duties satisfies for cyclo velocity reducer since inertia is low
five. Lessen maintenance charges: substantial dependability, extended existence, nominal routine maintenance in contrast to standard gearboxes
six. Interior areas replaceable with other brands to guarantee working.

seven. Grease Lubricated & Oil Lubricated Types Obtainable
eight. Output Shaft Rotation Route: One Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
9. Ambient Situations: Indoor Installation:10-forty Celsius, Max eighty five% Humidity, Below 1000m Altitude, Effectively Ventilated Surroundings, Free of corrosive,        explosive gases, vapors and dust
ten.Sluggish Speed Shaft Route: Horizontal, Vertical Up & Down, CZPT Direction
eleven.Mounting Design: Foot Mount, Flange Mount & Vertical F-flange Mount,
twelve. Input Relationship: Cyclo Integral Motor, Hollow Enter Shaft Adapter
13. Coupling Method With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
fourteen. Cycloid reducer Potential Variety: .37kW ~ 11kW

2. CZPT parameters

Sort Aged Variety Output Torque Output Shaft Dia.
SXJ00 JXJ00 98N.m φ30
SXJ01 JXJ01 221N.m φ35
SXJ02 JXJ02 448N.m φ45
SXJ03 JXJ03 986N.m φ55
SXJ04 JXJ04 1504N.m φ70
SXJ05 JXJ05 3051N.m φ90
SXJ06 JXJ06 5608N.m φ100

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned navy mould organization, was proven in 1965. CZPTshine specializes in the comprehensive electrical power transmission answer for substantial-end tools producing industries primarily based on the aim of “Platform Item, Software Design and style and Specialist Services”.
CZPTshine have a powerful technical power with over 350 personnel at present, which includes over 30 engineering technicians, 30 high quality inspectors, masking an location of 80000 sq. meters and types of CZPTd processing machines and testing equipments. We have a very good basis for the business application development and provider of large-stop speed reducers & variators possessing to the provincial engineering technologies investigation middle,the lab of equipment speed reducers, and the foundation of modern R&D.

Our Team

Top quality Control
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
item is a product inspection to determine the qualified products.

seven. Certification.

Packing

Supply

 

Impact Resistance Cycloidal CZPT