Impact Resistance for Ceramic Industry Cycloidal Gearbox

Impact Resistance for Ceramic CZPT Cycloidal CZPT

CZPTshine CZPT Cycloid Geared Motor Traits

1. Attributes:
1. Smooth working,low sounds gear tooth needle far more engagement.
2. Cycloidal tooth profile offers a substantial contact ratio to face up to overload shocks
three. Compact size: one ratio CZPT from one/9 to one/87, double phase up from 1/ninety nine to one/7569 
four. Ideal for dynamic programs: recurrent start off-stop-reversing duties suits for cyclo speed reducer considering that inertia is low
five. Lessen upkeep charges: high reliability, prolonged life, small servicing when compared to typical gearboxes
6. Inner elements replaceable with other brands to guarantee running.

7. Grease Lubricated & Oil Lubricated Types Obtainable
8. Output Shaft Rotation Path: One Reduction: Clockwise Rotation CZPT Reduction→ Counter Clockwise Rotation
nine. Ambient Situations: Indoor Installation:10-40 Celsius, Max eighty five% Humidity, Beneath 1000m Altitude, Well Ventilated Surroundings, Free of charge of corrosive,        explosive gases, vapors and dust
ten.Sluggish Velocity Shaft Path: Horizontal, Vertical Up & Down, CZPT Direction
eleven.Mounting Type: Foot Mount, Flange Mount & Vertical F-flange Mount,
twelve. Input Relationship: Cyclo Integral Motor, Hollow Enter Shaft Adapter
thirteen. Coupling Approach With CZPTn CZPT: Coupling, Gears, Chain Sprocket Or Belt
fourteen. Cycloid reducer Capacity Variety: .37kW ~ 11kW

2. CZPT parameters

Sort Old Type Output Torque Output Shaft Dia.
SXJ00 JXJ00 98N.m φ30
SXJ01 JXJ01 221N.m φ35
SXJ02 JXJ02 448N.m φ45
SXJ03 JXJ03 986N.m φ55
SXJ04 JXJ04 1504N.m φ70
SXJ05 JXJ05 3051N.m φ90
SXJ06 JXJ06 5608N.m φ100

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned military mould business, was recognized in 1965. CZPTshine specializes in the full power transmission solution for substantial-end tools production industries based on the goal of “Platform Solution, Software Design and Professional Provider”.
CZPTshine have a robust complex pressure with above 350 workers at present, such as over 30 engineering technicians, thirty good quality inspectors, masking an region of 80000 square meters and kinds of CZPTd processing devices and testing equipments. We have a excellent basis for the business application improvement and services of high-end velocity reducers & variators proudly owning to the provincial engineering engineering study heart,the lab of gear velocity reducers, and the foundation of modern day R&D.

Our Group

Quality Manage
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
product is a product inspection to determine the qualified products.

seven. Certification.

Packing

Supply

 

Impact Resistance for Ceramic CZPT Cycloidal CZPT