Industrial Speed Variator Combine with Worm Gearbox

CZPT Speed Variator Combine with Worm CZPT

JWB Collection Pace Variator 
1. Attributes:

 JWB-X  type

  • Dimensions: ≥04
  • Power up to 1.5 kW or a lot more
  • Situations in RAL 5571 blue forged iron
  • Shafts: situation hardened and tempered steel.
  • Inner factors: heat-treated metal
  • Output pace with four pole(1400r/min) motors: 2-10r/min4.7-23.5r/min15-75r/min20-100r/min, 28-140r/min, 30-150r/min40-200r/min60-300r/min80-400r/min100-500r/min190-950r/min.
  • Output Torque benefit max 1002Nm
  • CZPT, vibration-cost-free running
  • Bidirectional rotation
  • Handle handwheel positionable on either aspect
  • Slipping speed to max load at 5% 
  • Regulation sensibility: ,five rpm 
  • Painted with blue epoxy-polyester powder 

 JWB-X B sort

  • Measurements:01,02,03 and 04
  • Power up to 1.5 kW or less
  • Cases in die-forged aluminium alloy
  • Shafts: circumstance hardened and tempered metal.
  • Inner factors: heat-treated steel
  • Output speed with four pole(1400r/min) motors: 2r/min-20r/min4.7r/min-23.5r/min6.5-32.5r/min, 8-40r/min, 9-45r/min, thirteen-65r/min, 15r/min-75r/min18-90r/min, twenty five-125r/min, 28r/min-140r/min40r/min-200r/min60r/min-300r/min80r/min-400r/min100r/min-500r/min190r/min-950r/min.
  • Output Torque value max 795 Nm
  • CZPT, vibration-totally free running
  • Bidirectional rotation
  • Handle hand wheel positionable on possibly side
  • Slipping velocity to max load at five%
  • Regulation sensibility: ,5 rpm
  • Painted with blue epoxy-polyester powder 

2. CZPT parameters

 

Type Output Torque Output Shaft Dia.   Output Pace Range 2rpm-950rpm
SWB01 2.6-1.6N.m φ11 Applicable Motor Electrical power .18kW-7.5kW
SWB02 258-1.8N.m φ14,φ24,φ28,φ32  
SWB03 426-4N.m φ24,φ28,φ38 Input Options With Inline AC Motor
SWB04 795-8N.m φ28,φ38,φ42 With IEC Motor
SWB05 535-16N.m φ38,φ48,φ55 With Enter Shaft
SWB06 1002-40N.m φ42,φ55,φ70 With Input Flange

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned navy mould business, was recognized in 1965. CZPTshine specializes in the complete power transmission answer for high-conclude equipment producing industries dependent on the goal of “System Merchandise, Application Layout and Specialist Provider”.
CZPTshine have a strong complex pressure with above 350 personnel at existing, including over 30 engineering specialists, 30 top quality inspectors, masking an region of 80000 square meters and kinds of CZPTd processing machines and testing equipments. We have a good basis for the market software development and support of high-end speed reducers & variators proudly owning to the provincial engineering engineering investigation center,the lab of gear pace reducers, and the foundation of modern R&D.

Our Crew

Quality Handle
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
merchandise is a product inspection to determine the qualified products.

seven. Certification.

Packing

Shipping and delivery

CZPT Speed Variator Combine with Worm CZPT