Inline Shaft Stepless Speed Variator

Inline Shaft Stepless Speed Variator

JWB Sequence Speed Variator 
one. Attributes:

 JWB-X  type

  • Sizes: ≥04
  • Power up to 1.5 kW or much more
  • Instances in RAL 5571 blue cast iron
  • Shafts: case hardened and tempered steel.
  • Inside parts: warmth-handled steel
  • Output velocity with four pole(1400r/min) motors: 2-10r/min4.7-23.5r/min15-75r/min20-100r/min, 28-140r/min, thirty-150r/min40-200r/min60-300r/min80-400r/min100-500r/min190-950r/min.
  • Output Torque benefit max 1002Nm
  • CZPT, vibration-totally free operating
  • Bidirectional rotation
  • Manage handwheel positionable on both aspect
  • Slipping speed to max load at 5% 
  • Regulation sensibility: ,5 rpm 
  • Painted with blue epoxy-polyester powder 

 JWB-X B kind

  • Dimensions:01,02,03 and 04
  • Energy up to 1.5 kW or considerably less
  • Cases in die-forged aluminium alloy
  • Shafts: circumstance hardened and tempered steel.
  • Interior parts: heat-taken care of metal
  • Output speed with four pole(1400r/min) motors: 2r/min-20r/min4.7r/min-23.5r/min6.five-32.5r/min, eight-40r/min, nine-45r/min, thirteen-65r/min, 15r/min-75r/min18-90r/min, 25-125r/min, 28r/min-140r/min40r/min-200r/min60r/min-300r/min80r/min-400r/min100r/min-500r/min190r/min-950r/min.
  • Output Torque benefit max 795 Nm
  • CZPT, vibration-totally free working
  • Bidirectional rotation
  • Handle hand wheel positionable on possibly facet
  • Slipping speed to max load at five%
  • Regulation sensibility: ,five rpm
  • Painted with blue epoxy-polyester powder 

two. CZPT parameters

 

Type Output Torque Output Shaft Dia.   Output Velocity Selection 2rpm-950rpm
SWB01 two.6-one.6N.m φ11 Applicable Motor Electricity .18kW-7.5kW
SWB02 258-one.8N.m φ14,φ24,φ28,φ32  
SWB03 426-4N.m φ24,φ28,φ38 Enter Possibilities With Inline AC Motor
SWB04 795-8N.m φ28,φ38,φ42 With IEC Motor
SWB05 535-16N.m φ38,φ48,φ55 With Enter Shaft
SWB06 1002-40N.m φ42,φ55,φ70 With Enter Flange

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned army mould company, was recognized in 1965. CZPTshine specializes in the comprehensive electrical power transmission resolution for large-end gear production industries primarily based on the goal of “Platform Solution, Application Style and Specialist Provider”.
CZPTshine have a powerful complex drive with over 350 workers at existing, such as in excess of thirty engineering professionals, 30 good quality inspectors, masking an spot of 80000 square meters and kinds of CZPTd processing machines and testing equipments. We have a great foundation for the business application advancement and service of large-finish speed reducers & variators possessing to the provincial engineering engineering study centre,the lab of equipment velocity reducers, and the base of contemporary R&D.

Our Staff

Good quality Control
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
merchandise is a product inspection to determine the qualified products.

seven. Certification.

Packing

Shipping and delivery

Inline Shaft Stepless Speed Variator