International Standard Stepless Planetary Gear System

CZPT CZPT Stepless Planetary Gear System

JWB Collection Pace Variator 
1. Features:

 JWB-X  type

  • Measurements: ≥04
  • Power up to 1.5 kW or a lot more
  • Situations in RAL 5571 blue forged iron
  • Shafts: case hardened and tempered metal.
  • Inside factors: heat-dealt with metal
  • Output velocity with 4 pole(1400r/min) motors: 2-10r/min4.7-23.5r/min15-75r/min20-100r/min, 28-140r/min, 30-150r/min40-200r/min60-300r/min80-400r/min100-500r/min190-950r/min.
  • Output Torque value max 1002Nm
  • CZPT, vibration-cost-free running
  • Bidirectional rotation
  • Handle handwheel positionable on either facet
  • Slipping velocity to max load at 5% 
  • Regulation sensibility: ,5 rpm 
  • Painted with blue epoxy-polyester powder 

 JWB-X B sort

  • Measurements:01,02,03 and 04
  • Electrical power up to 1.5 kW or considerably less
  • Instances in die-solid aluminium alloy
  • Shafts: scenario hardened and tempered metal.
  • Internal elements: heat-taken care of metal
  • Output speed with four pole(1400r/min) motors: 2r/min-20r/min4.7r/min-23.5r/min6.5-32.5r/min, eight-40r/min, nine-45r/min, thirteen-65r/min, 15r/min-75r/min18-90r/min, 25-125r/min, 28r/min-140r/min40r/min-200r/min60r/min-300r/min80r/min-400r/min100r/min-500r/min190r/min-950r/min.
  • Output Torque benefit max 795 Nm
  • CZPT, vibration-cost-free working
  • Bidirectional rotation
  • Management hand wheel positionable on either facet
  • Slipping pace to max load at 5%
  • Regulation sensibility: ,five rpm
  • Painted with blue epoxy-polyester powder 

2. CZPT parameters

 

Type Output Torque Output Shaft Dia.   Output Speed Range 2rpm-950rpm
SWB01 2.six-one.6N.m φ11 Applicable Motor Power .18kW-seven.5kW
SWB02 258-one.8N.m φ14,φ24,φ28,φ32  
SWB03 426-4N.m φ24,φ28,φ38 Input Options With Inline AC Motor
SWB04 795-8N.m φ28,φ38,φ42 With IEC Motor
SWB05 535-16N.m φ38,φ48,φ55 With Input Shaft
SWB06 1002-40N.m φ42,φ55,φ70 With Input Flange

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned military mould business, was set up in 1965. CZPTshine specializes in the complete electricity transmission remedy for large-end equipment producing industries primarily based on the purpose of “System Solution, Application Design and Professional Services”.
CZPTshine have a powerful technological power with above 350 workers at current, which includes above thirty engineering professionals, thirty quality inspectors, masking an location of 80000 square meters and sorts of CZPTd processing devices and screening equipments. We have a very good foundation for the market application improvement and service of higher-finish velocity reducers & variators proudly owning to the provincial engineering technology research centre,the lab of gear pace reducers, and the foundation of present day R&D.

Our Group

High quality Management
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
merchandise is a product inspection to determine the qualified products.

seven. Certification.

Packing

Shipping

CZPT CZPT Stepless Planetary Gear System