Iron Casting Gear Speed Reducer

Iron CZPT Gear Speed Reducer

JWB Sequence Speed Variator 
1. Attributes:

 JWB-X  type

  • Sizes: ≥04
  • Power up to 1.5 kW or far more
  • Circumstances in RAL 5571 blue forged iron
  • Shafts: situation hardened and tempered steel.
  • Internal factors: warmth-handled metal
  • Output velocity with four pole(1400r/min) motors: 2-10r/min4.seven-23.5r/min15-75r/min20-100r/min, 28-140r/min, 30-150r/min40-200r/min60-300r/min80-400r/min100-500r/min190-950r/min.
  • Output Torque price max 1002Nm
  • CZPT, vibration-totally free working
  • Bidirectional rotation
  • Handle handwheel positionable on either facet
  • Slipping pace to max load at 5% 
  • Regulation sensibility: ,5 rpm 
  • Painted with blue epoxy-polyester powder 

 JWB-X B sort

  • Measurements:01,02,03 and 04
  • Electricity up to 1.5 kW or significantly less
  • Instances in die-cast aluminium alloy
  • Shafts: situation hardened and tempered metal.
  • Interior elements: warmth-taken care of steel
  • Output pace with four pole(1400r/min) motors: 2r/min-20r/min4.7r/min-23.5r/min6.5-32.5r/min, 8-40r/min, 9-45r/min, thirteen-65r/min, 15r/min-75r/min18-90r/min, 25-125r/min, 28r/min-140r/min40r/min-200r/min60r/min-300r/min80r/min-400r/min100r/min-500r/min190r/min-950r/min.
  • Output Torque worth max 795 Nm
  • CZPT, vibration-free of charge managing
  • Bidirectional rotation
  • Manage hand wheel positionable on both side
  • Slipping pace to max load at five%
  • Regulation sensibility: ,5 rpm
  • Painted with blue epoxy-polyester powder 

two. CZPT parameters

 

Type Output Torque Output Shaft Dia.   Output Pace Selection 2rpm-950rpm
SWB01 two.six-1.6N.m φ11 Applicable Motor Energy .18kW-7.5kW
SWB02 258-one.8N.m φ14,φ24,φ28,φ32  
SWB03 426-4N.m φ24,φ28,φ38 Enter Alternatives With Inline AC Motor
SWB04 795-8N.m φ28,φ38,φ42 With IEC Motor
SWB05 535-16N.m φ38,φ48,φ55 With Enter Shaft
SWB06 1002-40N.m φ42,φ55,φ70 With Input Flange

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned navy mould company, was set up in 1965. CZPTshine specializes in the complete electricity transmission resolution for large-finish products production industries based mostly on the purpose of “System Solution, Software Design and Skilled Support”.
CZPTshine have a robust technical pressure with more than 350 personnel at existing, which includes more than 30 engineering experts, thirty quality inspectors, covering an region of 80000 sq. meters and sorts of CZPTd processing machines and screening equipments. We have a excellent foundation for the sector software advancement and support of high-finish pace reducers & variators proudly owning to the provincial engineering technology study centre,the lab of gear pace reducers, and the foundation of present day R&D.

Our Staff

Top quality Management
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
merchandise is a product inspection to determine the qualified products.

seven. Certification.

Packing

Supply

Iron CZPT Gear Speed Reducer