JWB Series Velocity Variator
1. Functions:
JWB-X type
- Sizes: ≥04
- Power up to 1.5 kW or a lot more
- Situations in RAL 5571 blue solid iron
- Shafts: situation hardened and tempered steel.
- Internal factors: heat-treated steel
- Output speed with 4 pole(1400r/min) motors: 2-10r/min4.seven-23.5r/min15-75r/min20-100r/min, 28-140r/min, 30-150r/min40-200r/min60-300r/min80-400r/min100-500r/min190-950r/min.
- Output Torque worth max 1002Nm
- CZPT, vibration-free of charge managing
- Bidirectional rotation
- Manage handwheel positionable on possibly side
- Slipping speed to max load at five%
- Regulation sensibility: ,five rpm
- Painted with blue epoxy-polyester powder
JWB-X B sort
- Measurements:01,02,03 and 04
- Power up to 1.5 kW or much less
- Circumstances in die-cast aluminium alloy
- Shafts: case hardened and tempered metal.
- Internal parts: warmth-dealt with metal
- Output pace with 4 pole(1400r/min) motors: 2r/min-20r/min4.7r/min-23.5r/min6.5-32.5r/min, 8-40r/min, nine-45r/min, 13-65r/min, 15r/min-75r/min18-90r/min, twenty five-125r/min, 28r/min-140r/min40r/min-200r/min60r/min-300r/min80r/min-400r/min100r/min-500r/min190r/min-950r/min.
- Output Torque worth max 795 Nm
- CZPT, vibration-totally free operating
- Bidirectional rotation
- Manage hand wheel positionable on either facet
- Slipping velocity to max load at 5%
- Regulation sensibility: ,five rpm
- Painted with blue epoxy-polyester powder
two. CZPT parameters
Variety | Output Torque | Output Shaft Dia. | Output Velocity Variety | 2rpm-950rpm | |
SWB01 | 2.6-one.6N.m | φ11 | Applicable Motor Energy | .18kW-7.5kW | |
SWB02 | 258-1.8N.m | φ14,φ24,φ28,φ32 | |||
SWB03 | 426-4N.m | φ24,φ28,φ38 | Enter Choices | With Inline AC Motor | |
SWB04 | 795-8N.m | φ28,φ38,φ42 | With IEC Motor | ||
SWB05 | 535-16N.m | φ38,φ48,φ55 | With Enter Shaft | ||
SWB06 | 1002-40N.m | φ42,φ55,φ70 | With Input Flange |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned military mould business, was recognized in 1965. CZPTshine specializes in the complete electricity transmission remedy for high-end equipment manufacturing industries primarily based on the intention of “System Product, Software Style and Skilled Service”.
CZPTshine have a powerful specialized pressure with in excess of 350 employees at current, which includes over thirty engineering specialists, 30 top quality inspectors, masking an location of 80000 square meters and types of CZPTd processing machines and tests equipments. We have a great foundation for the market software improvement and support of substantial-stop velocity reducers & variators owning to the provincial engineering technology analysis heart,the lab of equipment velocity reducers, and the base of contemporary R&D.
Our Team
Good quality Control
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
solution is a product inspection to determine the qualified products.
7. Certification.
Packing
Supply