JWB Sequence Speed Variator
1. Attributes:
JWB-X type
- Dimensions: ≥04
- Power up to 1.5 kW or more
- Instances in RAL 5571 blue cast iron
- Shafts: case hardened and tempered steel.
- Inside parts: warmth-treated steel
- Output velocity with 4 pole(1400r/min) motors: 2-10r/min4.7-23.5r/min15-75r/min20-100r/min, 28-140r/min, thirty-150r/min40-200r/min60-300r/min80-400r/min100-500r/min190-950r/min.
- Output Torque price max 1002Nm
- CZPT, vibration-free running
- Bidirectional rotation
- Control handwheel positionable on possibly aspect
- Slipping pace to max load at 5%
- Regulation sensibility: ,five rpm
- Painted with blue epoxy-polyester powder
JWB-X B sort
- Dimensions:01,02,03 and 04
- Power up to 1.5 kW or considerably less
- Instances in die-cast aluminium alloy
- Shafts: situation hardened and tempered steel.
- Interior elements: warmth-taken care of steel
- Output pace with 4 pole(1400r/min) motors: 2r/min-20r/min4.7r/min-23.5r/min6.five-32.5r/min, 8-40r/min, nine-45r/min, thirteen-65r/min, 15r/min-75r/min18-90r/min, 25-125r/min, 28r/min-140r/min40r/min-200r/min60r/min-300r/min80r/min-400r/min100r/min-500r/min190r/min-950r/min.
- Output Torque worth max 795 Nm
- CZPT, vibration-free of charge operating
- Bidirectional rotation
- Control hand wheel positionable on either side
- Slipping speed to max load at five%
- Regulation sensibility: ,five rpm
- Painted with blue epoxy-polyester powder
two. CZPT parameters
Kind | Output Torque | Output Shaft Dia. | Output Pace Variety | 2rpm-950rpm | |
SWB01 | two.6-one.6N.m | φ11 | Relevant Motor Electrical power | .18kW-7.5kW | |
SWB02 | 258-one.8N.m | φ14,φ24,φ28,φ32 | |||
SWB03 | 426-4N.m | φ24,φ28,φ38 | Input Options | With Inline AC Motor | |
SWB04 | 795-8N.m | φ28,φ38,φ42 | With IEC Motor | ||
SWB05 | 535-16N.m | φ38,φ48,φ55 | With Enter Shaft | ||
SWB06 | 1002-40N.m | φ42,φ55,φ70 | With Input Flange |
About Us
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned armed forces mould organization, was recognized in 1965. CZPTshine specializes in the full power transmission solution for substantial-end products producing industries based mostly on the purpose of “System Item, Software Design and style and Expert Support”.
CZPTshine have a robust specialized power with more than 350 staff at existing, which includes in excess of 30 engineering experts, 30 top quality inspectors, covering an spot of 80000 square meters and types of CZPTd processing machines and testing equipments. We have a excellent foundation for the market application development and provider of higher-conclude speed reducers & variators possessing to the provincial engineering technological innovation analysis middle,the lab of gear pace reducers, and the base of modern R&D.
Our Crew
High quality Management
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
item is a product inspection to determine the qualified products.
seven. Certification.
Packing
Delivery