Jwb Series Speed Variator with Flange Mounted

Jwb Series Speed Variator with Flange Mounted

JWB Series Speed Variator 
one. Attributes:

 JWB-X  type

  • Measurements: ≥04
  • Power up to 1.5 kW or more
  • Situations in RAL 5571 blue solid iron
  • Shafts: situation hardened and tempered metal.
  • Internal components: heat-handled metal
  • Output pace with four pole(1400r/min) motors: 2-10r/min4.7-23.5r/min15-75r/min20-100r/min, 28-140r/min, thirty-150r/min40-200r/min60-300r/min80-400r/min100-500r/min190-950r/min.
  • Output Torque value max 1002Nm
  • CZPT, vibration-free working
  • Bidirectional rotation
  • Manage handwheel positionable on both side
  • Slipping pace to max load at five% 
  • Regulation sensibility: ,five rpm 
  • Painted with blue epoxy-polyester powder 

 JWB-X B kind

  • Sizes:01,02,03 and 04
  • Power up to 1.5 kW or less
  • Instances in die-cast aluminium alloy
  • Shafts: case hardened and tempered metal.
  • Interior factors: heat-taken care of steel
  • Output pace with 4 pole(1400r/min) motors: 2r/min-20r/min4.7r/min-23.5r/min6.5-32.5r/min, 8-40r/min, 9-45r/min, thirteen-65r/min, 15r/min-75r/min18-90r/min, 25-125r/min, 28r/min-140r/min40r/min-200r/min60r/min-300r/min80r/min-400r/min100r/min-500r/min190r/min-950r/min.
  • Output Torque worth max 795 Nm
  • CZPT, vibration-free working
  • Bidirectional rotation
  • Manage hand wheel positionable on possibly aspect
  • Slipping pace to max load at five%
  • Regulation sensibility: ,5 rpm
  • Painted with blue epoxy-polyester powder 

2. CZPT parameters

 

Kind Output Torque Output Shaft Dia.   Output Velocity Variety 2rpm-950rpm
SWB01 2.six-1.6N.m φ11 Relevant Motor Electrical power .18kW-7.5kW
SWB02 258-one.8N.m φ14,φ24,φ28,φ32  
SWB03 426-4N.m φ24,φ28,φ38 Input Alternatives With Inline AC Motor
SWB04 795-8N.m φ28,φ38,φ42 With IEC Motor
SWB05 535-16N.m φ38,φ48,φ55 With Input Shaft
SWB06 1002-40N.m φ42,φ55,φ70 With Enter Flange

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned army mould enterprise, was set up in 1965. CZPTshine specializes in the total power transmission remedy for large-end tools producing industries based on the intention of “Platform Item, Application Design and Skilled Service”.
CZPTshine have a powerful technological drive with more than 350 employees at existing, which includes in excess of thirty engineering experts, thirty good quality inspectors, covering an area of 80000 square meters and kinds of CZPTd processing machines and testing equipments. We have a great basis for the business software development and service of high-conclude speed reducers & variators owning to the provincial engineering technology investigation centre,the lab of equipment speed reducers, and the foundation of present day R&D.

Our Group

Top quality Control
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
solution is a product inspection to determine the qualified products.

7. Certification.

Packing

Supply

Jwb Series Speed Variator with Flange Mounted