Jwb-X Series Flange Mounted Speed Variator

Jwb-X Series Flange Mounted Speed Variator

JWB Sequence Pace Variator 
one. Features:

 JWB-X  type

  • Dimensions: ≥04
  • Power up to 1.5 kW or far more
  • Instances in RAL 5571 blue solid iron
  • Shafts: circumstance hardened and tempered steel.
  • Inner components: warmth-taken care of metal
  • Output velocity with 4 pole(1400r/min) motors: 2-10r/min4.7-23.5r/min15-75r/min20-100r/min, 28-140r/min, 30-150r/min40-200r/min60-300r/min80-400r/min100-500r/min190-950r/min.
  • Output Torque price max 1002Nm
  • CZPT, vibration-free working
  • Bidirectional rotation
  • Management handwheel positionable on both aspect
  • Slipping pace to max load at 5% 
  • Regulation sensibility: ,5 rpm 
  • Painted with blue epoxy-polyester powder 

 JWB-X B type

  • Dimensions:01,02,03 and 04
  • Electricity up to 1.5 kW or significantly less
  • Instances in die-solid aluminium alloy
  • Shafts: scenario hardened and tempered steel.
  • Inner components: warmth-taken care of metal
  • Output speed with four pole(1400r/min) motors: 2r/min-20r/min4.7r/min-23.5r/min6.five-32.5r/min, 8-40r/min, nine-45r/min, 13-65r/min, 15r/min-75r/min18-90r/min, 25-125r/min, 28r/min-140r/min40r/min-200r/min60r/min-300r/min80r/min-400r/min100r/min-500r/min190r/min-950r/min.
  • Output Torque value max 795 Nm
  • CZPT, vibration-totally free running
  • Bidirectional rotation
  • Management hand wheel positionable on either facet
  • Slipping pace to max load at 5%
  • Regulation sensibility: ,5 rpm
  • Painted with blue epoxy-polyester powder 

two. CZPT parameters

 

Kind Output Torque Output Shaft Dia.   Output Speed Selection 2rpm-950rpm
SWB01 2.6-1.6N.m φ11 Relevant Motor Electrical power .18kW-7.5kW
SWB02 258-one.8N.m φ14,φ24,φ28,φ32  
SWB03 426-4N.m φ24,φ28,φ38 Input Choices With Inline AC Motor
SWB04 795-8N.m φ28,φ38,φ42 With IEC Motor
SWB05 535-16N.m φ38,φ48,φ55 With Enter Shaft
SWB06 1002-40N.m φ42,φ55,φ70 With Enter Flange

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned army mould business, was proven in 1965. CZPTshine specializes in the complete energy transmission remedy for higher-end equipment manufacturing industries primarily based on the aim of “System Solution, Application Style and Skilled Service”.
CZPTshine have a sturdy complex pressure with above 350 workers at current, which includes above thirty engineering experts, 30 good quality inspectors, covering an area of 80000 square meters and kinds of CZPTd processing machines and tests equipments. We have a good foundation for the industry software development and provider of higher-finish speed reducers & variators owning to the provincial engineering technologies research heart,the lab of equipment speed reducers, and the foundation of present day R&D.

Our Group

High quality Management
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
item is a product inspection to determine the qualified products.

seven. Certification.

Packing

Shipping

Jwb-X Series Flange Mounted Speed Variator