Jwb-X Series Speed Variator with 0.75kw Motor Power

Jwb-X Series Speed Variator with 0.75kw Motor Power

JWB Series Pace Variator 
1. Features:

 JWB-X  type

  • Measurements: ≥04
  • Power up to 1.5 kW or more
  • Situations in RAL 5571 blue forged iron
  • Shafts: situation hardened and tempered steel.
  • Inside parts: heat-dealt with metal
  • Output velocity with four pole(1400r/min) motors: 2-10r/min4.7-23.5r/min15-75r/min20-100r/min, 28-140r/min, thirty-150r/min40-200r/min60-300r/min80-400r/min100-500r/min190-950r/min.
  • Output Torque benefit max 1002Nm
  • CZPT, vibration-free operating
  • Bidirectional rotation
  • Control handwheel positionable on either aspect
  • Slipping velocity to max load at 5% 
  • Regulation sensibility: ,5 rpm 
  • Painted with blue epoxy-polyester powder 

 JWB-X B variety

  • Measurements:01,02,03 and 04
  • Electrical power up to 1.5 kW or considerably less
  • Cases in die-cast aluminium alloy
  • Shafts: circumstance hardened and tempered metal.
  • Inner components: warmth-dealt with steel
  • Output velocity with four pole(1400r/min) motors: 2r/min-20r/min4.7r/min-23.5r/min6.five-32.5r/min, eight-40r/min, 9-45r/min, 13-65r/min, 15r/min-75r/min18-90r/min, twenty five-125r/min, 28r/min-140r/min40r/min-200r/min60r/min-300r/min80r/min-400r/min100r/min-500r/min190r/min-950r/min.
  • Output Torque price max 795 Nm
  • CZPT, vibration-free running
  • Bidirectional rotation
  • Management hand wheel positionable on both facet
  • Slipping speed to max load at 5%
  • Regulation sensibility: ,five rpm
  • Painted with blue epoxy-polyester powder 

two. CZPT parameters

 

Type Output Torque Output Shaft Dia.   Output Velocity Range 2rpm-950rpm
SWB01 two.six-one.6N.m φ11 Relevant Motor Electricity .18kW-7.5kW
SWB02 258-1.8N.m φ14,φ24,φ28,φ32  
SWB03 426-4N.m φ24,φ28,φ38 Enter Alternatives With Inline AC Motor
SWB04 795-8N.m φ28,φ38,φ42 With IEC Motor
SWB05 535-16N.m φ38,φ48,φ55 With Enter Shaft
SWB06 1002-40N.m φ42,φ55,φ70 With Enter Flange

About Us

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned armed forces mould company, was recognized in 1965. CZPTshine specializes in the full power transmission resolution for higher-stop gear manufacturing industries based on the intention of “System Solution, Application Style and Specialist Support”.
CZPTshine have a strong complex force with over 350 staff at existing, including in excess of 30 engineering professionals, 30 quality inspectors, masking an area of 80000 sq. meters and types of CZPTd processing equipment and tests equipments. We have a great foundation for the sector software improvement and services of higher-end velocity reducers & variators proudly owning to the provincial engineering technological innovation study centre,the lab of gear velocity reducers, and the base of present day R&D.

Our Group

Quality Control
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
solution is a product inspection to determine the qualified products.

7. Certification.

Packing

Shipping and delivery

Jwb-X Series Speed Variator with 0.75kw Motor Power