K sequence Parallel Shaft-CZPTcal Geared Motor Characteristics
1. Features:
- Substantial effectiveness: ninety two%-ninety three%
- Vertical output, compact framework, hard tooth surface , large output torque, reduced noise and long service daily life.
- Large precision: the gear is produced of substantial-good quality alloy metal forging, carbonitriding and hardening therapy, grinding procedure to make sure substantial precision and stable running.
- Substantial interchangeability: hugely modular, serial style, powerful versatility and interchangeability.
two. CZPT parameters
Ratio | five.36-197.37 |
Enter electrical power | .twelve-200KW |
Output torque | ten-62800N.m |
Output velocity | seven-415rpm |
Mounting variety | Foot mounted, foot mounted with sound shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Enter Technique | Flange enter(AM), shaft enter(Advertisement), inline AC motor input, or AQA servo motor |
Brake Release | HF-guide launch(lock in the brake release place), HR-manual release(autom-atic braking position) |
Thermistor | TF(Thermistor security PTC thermisto) TH(Thermistor safety Bimetal swotch) |
Mounting Placement | M1, M2, M3, M4, M5, M6 |
Sort | K37-K157 |
Output shaft dis. | 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm |
Housing materials | HT200 large-energy forged iron from R37,forty seven,fifty seven,67,seventy seven,87 |
Housing material | HT250 Higher strength solid iron from R97 107,137,147, 157,167,187 |
Heat treatment technology | carbonitriding and hardening treatment |
Single Stage Efficiency | up to 96% |
Lubricant | VG220 |
Security Class | IP55, F class |
CZPTshine CZPT
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned military mould organization, was set up in 1965. CZPTshine specializes in the full electrical power transmission answer for higher-finish gear manufacturing industries based on the intention of “Platform Product, Software Layout and Expert Support”.
CZPTshine have a robust specialized power with over 350 workers at current, like over 30 engineering specialists, 30 good quality inspectors, covering an location of 80000 square meters and sorts of CZPTd processing devices and screening equipments. We have a excellent foundation for the industry software advancement and service of higher-finish speed reducers & variators possessing to the provincial engineering technological innovation investigation centre,the lab of equipment velocity reducers, and the foundation of modern R&D.
Our Team
Good quality Management
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
merchandise is a product inspection to determine the qualified products.
7. Certification.
All our merchandise get ISO & CE & UL certification.
Packing
Shipping and delivery