K sequence Parallel Shaft-CZPTcal Geared Motor Qualities
one. Features:
- High performance: ninety two%-ninety three%
- Vertical output, compact construction, challenging tooth surface , big output torque, minimal noise and long provider life.
- Higher precision: the gear is created of substantial-quality alloy metal forging, carbonitriding and hardening treatment, grinding process to make certain higher precision and steady working.
- Higher interchangeability: very modular, serial design, powerful versatility and interchangeability.
two. CZPT parameters
Ratio | five.36-197.37 |
Input energy | .twelve-200KW |
Output torque | 10-62800N.m |
Output velocity | seven-415rpm |
Mounting kind | Foot mounted, foot mounted with solid shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm. |
Enter Approach | Flange enter(AM), shaft enter(Advert), inline AC motor input, or AQA servo motor |
Brake Launch | HF-manual release(lock in the brake launch placement), HR-handbook launch(autom-atic braking situation) |
Thermistor | TF(Thermistor defense PTC thermisto) TH(Thermistor protection Bimetal swotch) |
Mounting Place | M1, M2, M3, M4, M5, M6 |
Sort | K37-K157 |
Output shaft dis. | 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm |
Housing material | HT200 higher-energy solid iron from R37,forty seven,fifty seven,sixty seven,77,87 |
Housing content | HT250 Large strength cast iron from R97 107,137,147, 157,167,187 |
Warmth treatment technology | carbonitriding and hardening treatment |
Single Stage Efficiency | up to ninety six% |
Lubricant | VG220 |
Protection Class | IP55, F class |
CZPTshine CZPT
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned armed forces mould enterprise, was recognized in 1965. CZPTshine specializes in the full power transmission resolution for substantial-end equipment production industries primarily based on the purpose of “System Solution, Application Design and Professional Services”.
CZPTshine have a powerful specialized drive with more than 350 employees at current, including more than thirty engineering experts, 30 high quality inspectors, covering an spot of 80000 square meters and varieties of CZPTd processing equipment and tests equipments. We have a good basis for the business software improvement and support of higher-end speed reducers & variators possessing to the provincial engineering technological innovation research centre,the lab of equipment velocity reducers, and the foundation of modern day R&D.
Our Staff
Top quality Control
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective
measures to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the
solution is a product inspection to determine the qualified products.
7. Certification.
All our items get ISO & CE & UL certification.
Packing
Shipping