Model R Helical Gearbox

Model R Helical CZPT

R series CZPTcal Geared Motor Characteristics

1. Characteristics:

1. High efficiency: ninety two%-97%

 

two. Compact composition: Small offset output, two stage and three stage are in the exact same box.

 

three. High precision: the equipment is produced of high-high quality alloy steel forging, carbonitriding and hardening treatment, grinding procedure to guarantee large precision and stable managing.

four. High interchangeability: highly modular, serial design, strong flexibility and interchangeability.

2. CZPT parameters

Ratio three.41-289.seventy four
Enter electricity .12-160KW
Output torque 61-23200N.m
Output speed 5-415rpm
Mounting variety Foot mounted, flange mounted, foot and flange mounted, single-phase foot mounted, solitary stage flange mounted, Flange-mounted with prolonged bearing hub
Input Method Flange enter(AM), shaft input(Advertisement), inline AC motor enter, or AQA servo motor
Brake Release HF-guide release(lock in the brake release position), HR-guide release(autom-atic braking place)
Thermistor TF(Thermistor security PTC thermisto)
TH(Thermistor security Bimetal swotch)
Mounting Place M1, M2, M3, M4, M5, M6
Type R17-R167
Output shaft dis. 20mm, 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm
Housing substance HT200 high-energy cast iron from R37,47,57,67,seventy seven,87
Housing substance HT250 Substantial energy solid iron from R97 107,137,147,157,167,187
Warmth treatment technology carbonitriding and hardening therapy
Effectiveness 92%-97%
Lubricant VG220
Protection Class IP55, F class

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned navy mould company, was recognized in 1965. CZPTshine specializes in the full energy transmission remedy for higher-conclude gear producing industries based on the aim of “Platform Merchandise, Software Design and style and Specialist Services”.
CZPTshine have a sturdy technical pressure with in excess of 350 workers at current, which includes over thirty engineering experts, thirty good quality inspectors, masking an area of 80000 square meters and types of CZPTd processing equipment and testing equipments. We have a very good basis for the market software advancement and support of substantial-end speed reducers & variators owning to the provincial engineering technologies analysis center,the lab of equipment speed reducers, and the foundation of present day R&D.

Our Group

Quality Management
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
item is a product inspection to determine the qualified products.

7. Certification.

Packing

Shipping and delivery

Model R Helical CZPT