Nmrv Aluminium Worm Gear Box

Nmrv Aluminium Worm Gear Box

RV series Characteristics

  • RV – Measurements:030-040-050-063-075-one hundred and five-one hundred ten-a hundred thirty-150
  • Input Possibilities: with enter shaft, With Square flange,With Input Flange
  • Input Electrical power .06 to 11 kW
  • RV-Dimension from 030 to 105 in die-forged aluminium alloy budy and more than one hundred ten in solid iron
  • Ratios in between 5 and one hundred
  • Max torque 1550 N.m and admissible output radial masses max 8771 N
  • Aluminium units are provided total with artificial oil and let for common mounting positions, with no need to modify lubricant quantity
  • Worm wheel: Copper (KK Cu). 
  • Loading ability in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Dimensions 030 and over are painted with RAL 5571 blue
  • Worm equipment reducers are CZPT with diffferent combinations: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Options: torque arm, output flange, viton oil seals, low/high temperature oil, filling/drain/breather/level plug,Tiny hole

Simple models can be utilized to a extensive selection of electrical power reduction ratios from five to 1000.
Warranty: One year from day of shipping and delivery.

 

WORM GEARBOX          
SNW SERIES          Output Velocity Assortment:
Type Previous Sort Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Applicable Motor Electricity:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Enter Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Input Options2:
SNW090  RV090  410N.m  φ35   With Sq. flange
SNW105  RV105  630N.m  φ42   Input Options3:
SNW110  RV110  725N.m  φ42   With Input Shaft
SNW130  RV130  1050N.m  φ45   Input Options4:
SNW150  RV150  1550N.m  φ50   With Enter Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned army mould enterprise, was established in 1965. CZPTshine specializes in the comprehensive energy transmission answer for high-finish products producing industries based mostly on the intention of “Platform Merchandise, Software Design and style and Skilled Services”.
CZPTshine have a sturdy specialized power with in excess of 350 employees at present, which includes more than 30 engineering professionals, 30 quality inspectors, masking an location of 80000 square meters and types of CZPTd processing machines and tests equipments. We have a excellent basis for the business application development and service of high-stop pace reducers & variators possessing to the provincial engineering engineering study heart,the lab of equipment velocity reducers, and the foundation of contemporary R&D.

Our Crew

High quality Manage
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Shipping

Nmrv Aluminium Worm Gear Box