RV collection Traits
- RV – Sizes:030-040-050-063-075-one zero five-110-130-one hundred fifty
- Input Options: with input shaft, With Sq. flange,With Input Flange
- Input Electrical power .06 to 11 kW
- RV-Measurement from 030 to 105 in die-solid aluminium alloy budy and in excess of one hundred ten in forged iron
- Ratios amongst 5 and one hundred
- Max torque 1550 N.m and admissible output radial masses max 8771 N
- Aluminium models are equipped total with synthetic oil and enable for common mounting positions, with no need to have to modify lubricant quantity
- Worm wheel: Copper (KK Cu).
- Loading ability in accordance with: ISO 9001:2015/GB/T 19001-2016
- Measurement 030 and more than are painted with RAL 5571 blue
- Worm equipment reducers are CZPT with diffferent mixtures: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
- NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
- Choices: torque arm, output flange, viton oil seals, low/large temperature oil, filling/drain/breather/stage plug,Small hole
Fundamental types can be utilized to a vast variety of energy reduction ratios from five to one thousand.
Warranty: One year from date of supply.
WORM GEARBOX | |||||
SNW SERIES | Output Speed Assortment: | ||||
Type | Previous Variety | Output Torque | Output Shaft Dia. | 14rpm-280rpm | |
SNW030 | RV030 | 21N.m | φ14 | Applicable Motor Electrical power: | |
SNW040 | RV040 | 45N.m | φ19 | .06kW-11kW | |
SNW050 | RV050 | 84N.m | φ25 | Input Options1: | |
SNW063 | RV063 | 160N.m | φ25 | With Inline AC Motor | |
SNW075 | RV075 | 230N.m | φ28 | Enter Options2: | |
SNW090 | RV090 | 410N.m | φ35 | With Sq. flange | |
SNW105 | RV105 | 630N.m | φ42 | Enter Options3: | |
SNW110 | RV110 | 725N.m | φ42 | With Input Shaft | |
SNW130 | RV130 | 1050N.m | φ45 | Enter Options4: | |
SNW150 | RV150 | 1550N.m | φ50 | With Input Flange |
CZPTshine CZPT
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned armed forces mould organization, was recognized in 1965. CZPTshine specializes in the comprehensive electricity transmission remedy for substantial-conclude tools production industries based on the aim of “System Product, Software Design and style and Expert Services”.
CZPTshine have a sturdy specialized power with in excess of 350 personnel at current, which includes more than thirty engineering professionals, thirty good quality inspectors, covering an spot of 80000 sq. meters and sorts of CZPTd processing machines and testing equipments. We have a excellent foundation for the business software advancement and provider of higher-stop pace reducers & variators proudly owning to the provincial engineering technologies study centre,the lab of gear velocity reducers, and the foundation of contemporary R&D.
Our Group
Top quality Manage
Quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
is a product inspection to determine the qualified products.
Packing
Shipping and delivery