RV collection Traits
- RV – Dimensions:030-040-050-063-075-one zero five-one hundred ten-one hundred thirty-150
- Enter Possibilities: with input shaft, With Square flange,With Input Flange
- Enter Electricity .06 to 11 kW
- RV-Dimensions from 030 to 105 in die-forged aluminium alloy budy and over one hundred ten in cast iron
- Ratios in between 5 and 100
- Max torque 1550 N.m and admissible output radial masses max 8771 N
- Aluminium units are equipped full with artificial oil and permit for universal mounting positions, with no need to have to modify lubricant amount
- Worm wheel: Copper (KK Cu).
- Loading ability in accordance with: ISO 9001:2015/GB/T 19001-2016
- Size 030 and over are painted with RAL 5571 blue
- Worm equipment reducers are CZPT with diffferent combos: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
- NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
- Choices: torque arm, output flange, viton oil seals, low/large temperature oil, filling/drain/breather/stage plug,Small hole
Simple versions can be utilized to a extensive range of power reduction ratios from 5 to 1000.
Guarantee: One year from day of shipping.
WORM GEARBOX | |||||
SNW SERIES | Output Speed Range: | ||||
Type | Old Variety | Output Torque | Output Shaft Dia. | 14rpm-280rpm | |
SNW030 | RV030 | 21N.m | φ14 | Applicable Motor Energy: | |
SNW040 | RV040 | 45N.m | φ19 | .06kW-11kW | |
SNW050 | RV050 | 84N.m | φ25 | Input Options1: | |
SNW063 | RV063 | 160N.m | φ25 | With Inline AC Motor | |
SNW075 | RV075 | 230N.m | φ28 | Input Options2: | |
SNW090 | RV090 | 410N.m | φ35 | With Square flange | |
SNW105 | RV105 | 630N.m | φ42 | Input Options3: | |
SNW110 | RV110 | 725N.m | φ42 | With Enter Shaft | |
SNW130 | RV130 | 1050N.m | φ45 | Enter Options4: | |
SNW150 | RV150 | 1550N.m | φ50 | With Input Flange |
CZPTshine CZPT
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned armed forces mould business, was established in 1965. CZPTshine specializes in the total power transmission resolution for high-finish tools production industries based on the intention of “System Product, Software Layout and Skilled Service”.
CZPTshine have a robust technological force with above 350 workers at existing, such as in excess of thirty engineering professionals, 30 top quality inspectors, masking an area of 80000 square meters and varieties of CZPTd processing machines and testing equipments. We have a excellent foundation for the business software advancement and services of large-stop pace reducers & variators possessing to the provincial engineering engineering analysis middle,the lab of equipment velocity reducers, and the foundation of present day R&D.
Our Crew
Good quality Control
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
to prevent recurrence.
4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
is a product inspection to determine the qualified products.
Packing
Supply