Nmrv Series Worm Gear Reducer Manufacturer

Nmrv Series Worm Gear Reducer Manufacturer

RV sequence Characteristics

  • RV – Measurements:030-040-050-063-075-105-110-130-one hundred fifty
  • Enter Possibilities: with input shaft, With Square flange,With Enter Flange
  • Enter Energy .06 to 11 kW
  • RV-Dimensions from 030 to 105 in die-cast aluminium alloy budy and above a hundred and ten in forged iron
  • Ratios between five and a hundred
  • Max torque 1550 N.m and admissible output radial masses max 8771 N
  • Aluminium units are provided complete with synthetic oil and let for common mounting positions, with no need to have to modify lubricant amount
  • Worm wheel: Copper (KK Cu). 
  • Loading capability in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Dimensions 030 and above are painted with RAL 5571 blue
  • Worm gear reducers are CZPT with diffferent mixtures: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Alternatives: torque arm, output flange, viton oil seals, reduced/high temperature oil, filling/drain/breather/stage plug,Small gap

Simple models can be applied to a wide range of electrical power reduction ratios from 5 to one thousand.
Warranty: One year from date of shipping and delivery.

 

WORM GEARBOX          
SNW SERIES          Output Pace Variety:
Variety Previous Variety Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Relevant Motor Electricity:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Enter Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Input Options2:
SNW090  RV090  410N.m  φ35   With Sq. flange
SNW105  RV105  630N.m  φ42   Input Options3:
SNW110  RV110  725N.m  φ42   With Input Shaft
SNW130  RV130  1050N.m  φ45   Enter Options4:
SNW150  RV150  1550N.m  φ50   With Enter Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned armed forces mould organization, was recognized in 1965. CZPTshine specializes in the total power transmission solution for high-stop gear manufacturing industries primarily based on the goal of “Platform Item, Software Style and Skilled Services”.
CZPTshine have a robust technological pressure with in excess of 350 personnel at current, including above thirty engineering experts, 30 top quality inspectors, masking an region of 80000 square meters and kinds of CZPTd processing machines and tests equipments. We have a great foundation for the market application advancement and support of large-stop velocity reducers & variators proudly owning to the provincial engineering engineering study middle,the lab of equipment velocity reducers, and the foundation of modern day R&D.

Our Team

Quality Management
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Shipping

Nmrv Series Worm Gear Reducer Manufacturer