RV series Characteristics
- RV – Measurements:030-040-050-063-075-105-a hundred and ten-a hundred thirty-one hundred fifty
- Enter Possibilities: with input shaft, With Sq. flange,With Input Flange
- Enter Electricity .06 to 11 kW
- RV-Size from 030 to 105 in die-solid aluminium alloy budy and in excess of a hundred and ten in cast iron
- Ratios between 5 and one hundred
- Max torque 1550 N.m and admissible output radial hundreds max 8771 N
- Aluminium units are equipped total with synthetic oil and permit for common mounting positions, with no need to have to modify lubricant amount
- Worm wheel: Copper (KK Cu).
- Loading ability in accordance with: ISO 9001:2015/GB/T 19001-2016
- Dimension 030 and in excess of are painted with RAL 5571 blue
- Worm equipment reducers are CZPT with diffferent mixtures: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
- NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
- Possibilities: torque arm, output flange, viton oil seals, low/higher temperature oil, filling/drain/breather/amount plug,Tiny gap
Standard versions can be utilized to a wide assortment of electrical power reduction ratios from five to one thousand.
Guarantee: One year from day of shipping and delivery.
WORM GEARBOX | |||||
SNW SERIES | Output Speed Selection: | ||||
Variety | Old Kind | Output Torque | Output Shaft Dia. | 14rpm-280rpm | |
SNW030 | RV030 | 21N.m | φ14 | Applicable Motor Energy: | |
SNW040 | RV040 | 45N.m | φ19 | .06kW-11kW | |
SNW050 | RV050 | 84N.m | φ25 | Enter Options1: | |
SNW063 | RV063 | 160N.m | φ25 | With Inline AC Motor | |
SNW075 | RV075 | 230N.m | φ28 | Enter Options2: | |
SNW090 | RV090 | 410N.m | φ35 | With Square flange | |
SNW105 | RV105 | 630N.m | φ42 | Input Options3: | |
SNW110 | RV110 | 725N.m | φ42 | With Input Shaft | |
SNW130 | RV130 | 1050N.m | φ45 | Enter Options4: | |
SNW150 | RV150 | 1550N.m | φ50 | With Input Flange |
CZPTshine CZPT
ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned military mould organization, was proven in 1965. CZPTshine specializes in the comprehensive power transmission solution for substantial-finish tools producing industries primarily based on the purpose of “Platform Merchandise, Software Design and style and Skilled Provider”.
CZPTshine have a powerful complex pressure with over 350 workers at present, such as over thirty engineering technicians, 30 high quality inspectors, covering an spot of 80000 square meters and sorts of CZPTd processing equipment and tests equipments. We have a very good basis for the sector application development and provider of high-end pace reducers & variators possessing to the provincial engineering technology analysis heart,the lab of equipment pace reducers, and the foundation of contemporary R&D.
Our Staff
Good quality Management
Good quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
is a product inspection to determine the qualified products.
Packing
Shipping