Nmrv Worm Gearbox with Output Flange

Nmrv Worm CZPT with Output Flange

RV collection Traits

  • RV – Sizes:030-040-050-063-075-a hundred and five-one hundred ten-one hundred thirty-one hundred fifty
  • Enter Choices: with enter shaft, With Sq. flange,With Input Flange
  • Enter Power .06 to 11 kW
  • RV-Dimension from 030 to 105 in die-forged aluminium alloy budy and over 110 in forged iron
  • Ratios among 5 and 100
  • Max torque 1550 N.m and admissible output radial loads max 8771 N
  • Aluminium models are supplied total with artificial oil and allow for universal mounting positions, with no need to have to modify lubricant quantity
  • Worm wheel: Copper (KK Cu). 
  • Loading capability in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Size 030 and over are painted with RAL 5571 blue
  • Worm equipment reducers are CZPT with diffferent combos: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Options: torque arm, output flange, viton oil seals, reduced/substantial temperature oil, filling/drain/breather/stage plug,Small gap

Basic versions can be used to a extensive range of energy reduction ratios from 5 to 1000.
Guarantee: One year from day of shipping.

 

WORM GEARBOX          
SNW SERIES          Output Pace Assortment:
Sort Previous Variety Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Relevant Motor Electricity:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Enter Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Input Options2:
SNW090  RV090  410N.m  φ35   With Sq. flange
SNW105  RV105  630N.m  φ42   Enter Options3:
SNW110  RV110  725N.m  φ42   With Enter Shaft
SNW130  RV130  1050N.m  φ45   Input Options4:
SNW150  RV150  1550N.m  φ50   With Enter Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a point out-owned armed forces mould organization, was set up in 1965. CZPTshine specializes in the complete electrical power transmission solution for high-finish gear producing industries dependent on the purpose of “System Item, Application Design and style and Skilled Services”.
CZPTshine have a sturdy specialized drive with in excess of 350 employees at existing, including more than 30 engineering experts, thirty good quality inspectors, masking an region of 80000 square meters and sorts of CZPTd processing equipment and tests equipments. We have a very good basis for the sector software development and services of substantial-stop velocity reducers & variators owning to the provincial engineering technology investigation heart,the lab of equipment velocity reducers, and the foundation of modern day R&D.

Our Group

Quality Control
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Delivery

 

Nmrv Worm CZPT with Output Flange