Nmrv030 Aluminum Worm Gearbox

Nmrv030 Aluminum Worm CZPT

RV collection Qualities

  • RV – Measurements:030-040-050-063-075-one zero five-one hundred ten-one hundred thirty-a hundred and fifty
  • Enter Alternatives: with input shaft, With Square flange,With Input Flange
  • Input Electrical power .06 to 11 kW
  • RV-Measurement from 030 to 105 in die-forged aluminium alloy budy and above one hundred ten in solid iron
  • Ratios amongst five and one hundred
  • Max torque 1550 N.m and admissible output radial loads max 8771 N
  • Aluminium models are provided total with synthetic oil and permit for universal mounting positions, with no want to modify lubricant quantity
  • Worm wheel: Copper (KK Cu). 
  • Loading potential in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Measurement 030 and in excess of are painted with RAL 5571 blue
  • Worm gear reducers are CZPT with diffferent combinations: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Options: torque arm, output flange, viton oil seals, low/high temperature oil, filling/drain/breather/level plug,Little hole

Fundamental versions can be applied to a broad variety of power reduction ratios from 5 to a thousand.
Guarantee: One year from day of delivery.

 

WORM GEARBOX          
SNW SERIES          Output Speed Range:
Type Outdated Kind Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Applicable Motor Electricity:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Input Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Enter Options2:
SNW090  RV090  410N.m  φ35   With Square flange
SNW105  RV105  630N.m  φ42   Enter Options3:
SNW110  RV110  725N.m  φ42   With Input Shaft
SNW130  RV130  1050N.m  φ45   Input Options4:
SNW150  RV150  1550N.m  φ50   With Enter Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a condition-owned armed forces mould company, was established in 1965. CZPTshine specializes in the complete power transmission solution for substantial-conclude gear production industries based on the goal of “System Product, Application Design and style and Specialist Support”.
CZPTshine have a robust technical power with more than 350 staff at existing, including over thirty engineering experts, 30 good quality inspectors, covering an spot of 80000 sq. meters and sorts of CZPTd processing machines and testing equipments. We have a good basis for the sector software advancement and provider of higher-end speed reducers & variators proudly owning to the provincial engineering technological innovation research heart,the lab of gear pace reducers, and the base of present day R&D.

Our Staff

Good quality Management
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Delivery

Nmrv030 Aluminum Worm CZPT