Nmrv030 Worm Gearbox with 15 Ratio

Nmrv030 Worm CZPT with 15 Ratio

RV sequence Qualities

  • RV – Dimensions:030-040-050-063-075-105-a hundred and ten-a hundred thirty-150
  • Enter Alternatives: with enter shaft, With Sq. flange,With Enter Flange
  • Enter Power .06 to 11 kW
  • RV-Measurement from 030 to 105 in die-forged aluminium alloy budy and over one hundred ten in cast iron
  • Ratios between five and 100
  • Max torque 1550 N.m and admissible output radial hundreds max 8771 N
  • Aluminium units are equipped full with synthetic oil and allow for common mounting positions, with no want to modify lubricant amount
  • Worm wheel: Copper (KK Cu). 
  • Loading potential in accordance with: ISO 9001:2015/GB/T 19001-2016
  • Measurement 030 and in excess of are painted with RAL 5571 blue
  • Worm gear reducers are CZPT with diffferent combos: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
  • NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
  • Choices: torque arm, output flange, viton oil seals, minimal/large temperature oil, filling/drain/breather/stage plug,Tiny hole

Standard models can be applied to a broad variety of power reduction ratios from 5 to a thousand.
Warranty: One year from date of shipping and delivery.

 

WORM GEARBOX          
SNW SERIES          Output Speed Range:
Variety Old Sort Output Torque Output Shaft Dia.   14rpm-280rpm
SNW030  RV030  21N.m  φ14   Applicable Motor Energy:
SNW040  RV040  45N.m  φ19   .06kW-11kW
SNW050  RV050  84N.m  φ25   Enter Options1:
SNW063  RV063  160N.m  φ25   With Inline AC Motor
SNW075  RV075  230N.m  φ28   Input Options2:
SNW090  RV090  410N.m  φ35   With Square flange
SNW105  RV105  630N.m  φ42   Enter Options3:
SNW110  RV110  725N.m  φ42   With Enter Shaft
SNW130  RV130  1050N.m  φ45   Input Options4:
SNW150  RV150  1550N.m  φ50   With Input Flange

CZPTshine CZPT

ZheCZPT CZPTshine CZPT Co.,Ltd,the predecessor was a state-owned military mould enterprise, was set up in 1965. CZPTshine specializes in the full power transmission remedy for large-finish equipment producing industries based on the goal of “Platform Item, Application Style and Expert Support”.
CZPTshine have a robust technical force with above 350 staff at existing, such as over thirty engineering professionals, 30 top quality inspectors, covering an spot of 80000 sq. meters and types of CZPTd processing machines and tests equipments. We have a great foundation for the sector application growth and services of higher-finish speed reducers & variators possessing to the provincial engineering technological innovation analysis middle,the lab of gear speed reducers, and the base of modern R&D.

Our Crew

Quality Control
High quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
 to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
 is a product inspection to determine the qualified products.

Packing

Supply

 

Nmrv030 Worm CZPT with 15 Ratio